<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd" xmlns:googleplay="http://www.google.com/schemas/play-podcasts/1.0"><channel><title><![CDATA[SAM BROOKS]]></title><description><![CDATA[Modern electric utilities and the AI power boom—the money, lies, and soaring bills.]]></description><link>https://www.isambrooks.com</link><image><url>https://substackcdn.com/image/fetch/$s_!UmM3!,w_256,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb0a7c38e-eab5-4fab-a385-071bb299682a_1280x1280.png</url><title>SAM BROOKS</title><link>https://www.isambrooks.com</link></image><generator>Substack</generator><lastBuildDate>Tue, 17 Nov 2026 18:11:39 GMT</lastBuildDate><atom:link href="https://www.isambrooks.com/feed" rel="self" type="application/rss+xml"/><copyright><![CDATA[SAM BROOKS]]></copyright><language><![CDATA[en]]></language><webMaster><![CDATA[isambrooks@substack.com]]></webMaster><itunes:owner><itunes:email><![CDATA[isambrooks@substack.com]]></itunes:email><itunes:name><![CDATA[SAM BROOKS]]></itunes:name></itunes:owner><itunes:author><![CDATA[SAM BROOKS]]></itunes:author><googleplay:owner><![CDATA[isambrooks@substack.com]]></googleplay:owner><googleplay:email><![CDATA[isambrooks@substack.com]]></googleplay:email><googleplay:author><![CDATA[SAM BROOKS]]></googleplay:author><itunes:block><![CDATA[Yes]]></itunes:block><item><title><![CDATA[AI’s Half-Used Data Centers]]></title><description><![CDATA[Many data centers &#8212; AI&#8217;s factories &#8212; are plugged in, but utilized at surprisingly low levels. For hundreds of billions of dollars, you&#8217;d think they&#8217;d use them.]]></description><link>https://www.isambrooks.com/p/ais-half-used-data-centers</link><guid isPermaLink="false">https://www.isambrooks.com/p/ais-half-used-data-centers</guid><dc:creator><![CDATA[SAM BROOKS]]></dc:creator><pubDate>Tue, 03 Nov 2026 16:55:47 GMT</pubDate><enclosure url="https://substack-post-media.s3.amazonaws.com/public/images/4ee966de-37ff-4557-96c3-aa249e335a50_1440x1080.jpeg" length="0" type="image/jpeg"/><content:encoded><![CDATA[<p>&#8220;Anthropic has built the token factory,&#8221; <a href="https://www.coatue.com/blog/press/our-partnership-with-anthropic-enterprise-intelligence-has-liftoff">Coatue says</a>. <a href="https://nvidianews.nvidia.com/news/spectrum-x-ethernet-networking-xai-colossus">SpaceX</a>&#8217;s Colossus is an &#8220;optimized AI factory&#8221;; <a href="https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001493152-26-027984/ex99-1.htm">Applied Digital</a> builds &#8220;AI Factory Campuses.&#8221; It&#8217;s not clear if <a href="https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/">Microsoft</a>&#8217;s Fairwater, &#8220;a planet-scale AI superfactory,&#8221; qualifies as one of <a href="https://investor.nvidia.com/news/press-release-details/2025/NVIDIA-Introduces-Spectrum-XGS-Ethernet-to-Connect-Distributed-Data-Centers-Into-Giga-Scale-AI-Super-Factories/default.aspx">Jensen Huang&#8217;s</a> &#8220;vast, giga-scale AI super-factories,&#8221; but the Nvidia CEO sometimes <a href="https://fortune.com/article/jensen-huang-ai-manufacturing/">speaks in plain English</a>:</p><blockquote><p>&#8220;I call them AI factories. The raw material that goes in is electricity. What comes out of it is tokens.&#8221;</p></blockquote><p>Fine: <em>factories </em>it is. </p><p>An AI factory is a data center, and a data center works by running electricity through computer chips. Power goes in, and tokens &#8212; the bits of text and code you get with a subscription to Claude &#8212; come out. A Ford F-150 factory needs thousands of workers across multiple shifts, and supply chains of steel, rubber, and glass. An AI factory just needs chips and electricity.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!NwcX!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!NwcX!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png 424w, https://substackcdn.com/image/fetch/$s_!NwcX!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png 848w, https://substackcdn.com/image/fetch/$s_!NwcX!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png 1272w, https://substackcdn.com/image/fetch/$s_!NwcX!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png 1456w" sizes="100vw"><img src="https://substackcdn.com/image/fetch/$s_!NwcX!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png" width="1456" height="536" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:536,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:1874726,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:false,&quot;topImage&quot;:true,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/221652393?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!NwcX!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png 424w, https://substackcdn.com/image/fetch/$s_!NwcX!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png 848w, https://substackcdn.com/image/fetch/$s_!NwcX!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png 1272w, https://substackcdn.com/image/fetch/$s_!NwcX!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F35800668-931f-47f9-b4f2-bd7005f214ff_2067x761.png 1456w" sizes="100vw" fetchpriority="high"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><p>That&#8217;s why data centers are described in units of power: megawatts (MW) or gigawatts (GW, which is 1,000 MW). When SpaceX reported 1.7 GW across its factories two weeks ago, that was the total power capacity of its computer chips. Just like a 1,200-watt hair dryer draws 1,200 watts when it&#8217;s on, 1.7 GW of chips draw 1.7 GW when they&#8217;re on &#8212; and a lot less when they&#8217;re not. </p><p>Nvidia&#8217;s newest chips cost $40 billion per GW, so when <a href="https://seekingalpha.com/article/4955677-space-exploration-technologies-corp-spcx-q3-2026-earnings-call-transcript">Elon Musk says</a> he&#8217;s &#8220;highly confident of 10 gigawatts next year,&#8221; that&#8217;s $400 billion of machinery. Whether those billions make sense depends on several obvious factors, such as demand for the tokens and how much people will pay for them. But there&#8217;s an even more basic question: are you utilizing your factories?</p><p>This isn&#8217;t an advanced business concept. If you run an airline, you fill the planes you&#8217;ve got before ordering new ones. If you own office buildings, you fully lease the ones you&#8217;ve got before building more. You don&#8217;t expand your restaurant if the current one is half-full. </p><p>Yet the AI world almost never talks about <em>utilization</em>. It&#8217;s always about <em>capacity</em>, and I think I know why. </p><p>I&#8217;ve examined some of the factories already built in places like Ellendale, North Dakota, and the suburbs of Memphis. I&#8217;ve pieced together tons of power data, from electric meters and turbines and natural gas pipelines, to see how much power is <em>actually</em> flowing, versus how much <em>could</em> flow. And there&#8217;s no doubt:</p><p>These factories are not fully utilized. Not even close. </p><div><hr></div><div class="callout-block" data-callout="true"><h3>Dario&#8217;s Pizza</h3><p>Imagine your local pizza spot, Dario&#8217;s Pizza, has one of those big, fancy pizza ovens. One night Dario stops by your table beaming: he&#8217;s signed a lease for a second oven. It&#8217;s expensive, sure, but people love this pizza. Now get this: across town, Satya&#8217;s Pizza just bought four new pizza ovens. <em>Four!</em> And Elon&#8217;s Pizza is making its own ovens; the owner says they&#8217;ll have ten by next year. <em>Ten!</em>  </p><p>If you were a pizza investor, you&#8217;d have questions. How much does a pizza cost? How much pizza can this pizza-crazed town even eat? But before you put a dollar into Dario&#8217;s or Satya&#8217;s or Elon&#8217;s, you&#8217;d better find out: <em>Are they fully utilizing the ovens they already have?</em> Because if they&#8217;re making 100 pizzas a night in an oven built to make 200, they don&#8217;t need a new oven. Or ten.</p></div><div><hr></div><h3>Factories: Best When Used</h3><p>Rule one of factories: use them. As much as you possibly can.</p><p>Steelmakers have been doing the factory thing for a while, and they live by this. Nucor, <a href="https://nucor.com/">the largest in North America</a>, ran its mills at <a href="https://www.prnewswire.com/news-releases/nucor-reports-results-for-the-third-quarter-of-2026-302919790.html">89%</a> in the third quarter. For every 100 tons of steel its factories could make, they made 89. Steel Dynamics did even better, at 92%, and its CEO <a href="https://seekingalpha.com/article/4955592-steel-dynamics-inc-stld-q3-2026-earnings-call-transcript">bragged about it</a>. The company&#8217;s strategy, he said, &#8220;supports stronger through-cycle facility utilization and drives superior financial performance.&#8221; Translation: they ran their factories hard, so they made a lot of steel, so they made a lot of money. </p><p>The token factory known as Anthropic understands all this. Its <a href="https://www.sec.gov/Archives/edgar/data/2130357/000162828026067168/anthropicpbc-sx1.htm">IPO filing</a> names &#8220;Compute Efficiency&#8221; as one of the main drivers of financial performance: &#8220;We are focused on increasing the intelligence produced and revenue generated per dollar of compute invested.&#8221; In a section titled &#8220;Securing Sufficient Compute and Optimizing its Utilization,&#8221; which wasn&#8217;t at all repetitive or a parody of AI writing, the company explained:</p><blockquote><p>&#8220;<strong>Optimizing </strong>the<strong> utilization </strong>of our <strong>compute</strong>&#8230; We rely on <strong>compute</strong> <strong>efficiencies</strong>, such as the discovery of <strong>compute</strong> multipliers, to get the <strong>most out of the</strong> <strong>compute</strong> that we procure. Our ability to <strong>effectively</strong> direct <strong>compute</strong> and drive <strong>compute</strong> <strong>efficiencies</strong>...&#8221; (Emphasis added.)</p></blockquote><p>At least on paper, Anthropic wants its factories working, not idle, because the harder they run, the more money they make.  </p><div><hr></div><h3>&#8220;Never Sits Idle&#8221;</h3><p>Polaris Forge, in Ellendale, North Dakota, has everything an AI factory needs: the building, the chips, the power.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-1" href="#footnote-1" target="_self">1</a> </p><p>Its landlord, Applied Digital, <a href="https://ir.applieddigital.com/news-events/press-releases/detail/137/applied-digital-completes-phase-ii-ready-for-service-at">said last November</a> the first building was running at &#8220;full 100 MW critical IT load,&#8221; which is industry-speak for 100 MW of chips. <a href="https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000030/apld-20260228.htm">In an SEC filing</a> this April, it confirmed the building &#8220;was fully operating during the current quarter.&#8221; </p><p>The chips here belong to CoreWeave, which fills data centers with Nvidia chips (GPUs, in the industry&#8217;s shorthand) and rents time on them to firms <a href="https://coreweave.com/news/coreweave-announces-multi-year-agreement-with-anthropic">such as Anthropic</a>.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-2" href="#footnote-2" target="_self">2</a> One of CoreWeave&#8217;s main selling points is keeping the chips busy. Without the right setup, <a href="https://www.coreweave.com/blog/breaking-the-bottlenecks-scaling-ai-without-stalling">CoreWeave warns</a>, &#8220;it&#8217;s almost impossible to guarantee that your GPU resources are being utilized to their fullest.&#8221; Its fix: &#8220;GPU elasticity &#8230; allows you to ensure that capacity never sits idle.&#8221;</p><p>Applied&#8217;s other big Ellendale factory is a bitcoin mine, and it&#8217;s anything but idle. The local utility, Montana-Dakota Utilities (MDU), reports one number for all of its North Dakota commercial customers, added together, so it&#8217;s rare for any single customer to move it. But when <a href="https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-23-000079/applieddigitalannouncesene.htm">the mine switched on</a> in March 2023, that number more than doubled, from a steady 120 MW to 280 MW.</p><p>Next door, Polaris Forge has been plugged in for nearly two years. The campus had 225 MW of electric service when its <a href="https://ir.applieddigital.com/news-events/press-releases/detail/114/applied-digital-announces-ellendale-hpc-data-center">substation was energized</a> in December 2024, and two months later, <a href="https://www.psc.nd.gov/webdocs/case/24-0332/018-010.pdf">regulators approved it</a> for up to 350 MW.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!FbZM!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!FbZM!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png 424w, https://substackcdn.com/image/fetch/$s_!FbZM!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png 848w, https://substackcdn.com/image/fetch/$s_!FbZM!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!FbZM!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!FbZM!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png" width="1456" height="1092" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1092,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:202756,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/221652393?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!FbZM!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png 424w, https://substackcdn.com/image/fetch/$s_!FbZM!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png 848w, https://substackcdn.com/image/fetch/$s_!FbZM!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!FbZM!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F98d8f5c6-f7ad-4751-8dbb-a3123bcc8809_3200x2400.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><p>And yet, Polaris Forge has barely moved the meter.</p><p>All of MDU&#8217;s North Dakota commercial customers pulled 22 MW more this summer than the year before. After accounting for the power <a href="https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-24-000175/investorpresentationfina.htm">Applied says the buildings use</a> for cooling and other non-chip needs &#8212; and assuming Polaris Forge was responsible for every watt of the increase &#8212; that&#8217;s about 19 MW of chips. Applied said the first building was operating at 100 MW.</p><p>Nineteen. </p><p>Applied is expanding anyway. &#8220;175 MW now live at the campus,&#8221; <a href="https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1">it announced</a> in a July press release that said &#8220;AI Factory&#8221; five times. Last month, with 250 MW of capacity, <a href="https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai">it declared</a> the campus &#8220;fully operational.&#8221;</p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/p/ais-half-used-data-centers?utm_source=substack&utm_medium=email&utm_content=share&action=share&quot;,&quot;text&quot;:&quot;Share&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/p/ais-half-used-data-centers?utm_source=substack&utm_medium=email&utm_content=share&action=share"><span>Share</span></a></p><div><hr></div><h3>Half-Lit Factories</h3><p>Everywhere I&#8217;ve looked, AI factories are running at a fraction of their capacity.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-3" href="#footnote-3" target="_self">3</a></p><p><strong>Colossus 2</strong></p><p>Elon Musk&#8217;s data center in the suburbs of Memphis runs on its own fleet of natural-gas turbines, which make the power flows unusually easy to see. Two public records &#8212; a log of each turbine&#8217;s running hours, and the pipeline&#8217;s daily gas deliveries &#8212; pin down how much power is getting to the chips.</p><p>SpaceX, which owns the AI company xAI, <a href="https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm">told the SEC</a> it had 1,400 MW of chips installed at the end of June; by my count, that meant 1,080 MW at Colossus 2. As <a href="https://www.isambrooks.com/p/wheres-the-ai-power-boom">I reported several weeks ago</a>, the <a href="https://rachelandthecity.com/the-xai-files/records/upcoming-hearing/mzx-runtime-table-2026-07-10.pdf">turbines that ran</a> in June generated enough power for about 550 MW of chips.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-4" href="#footnote-4" target="_self">4</a> In other words, the factory was running at about half. </p><p>New <a href="https://www.gasquest.com/informational-posting">gas pipeline data</a> extends the picture through September 30. By then, SpaceX told Wall Street, it had 1.7 GW, about 1,380 MW of that at Colossus 2. According to the gas data, the turbines were burning enough fuel to run about 775 MW of chips. The &#8220;optimized AI factory&#8221; was still running at barely more than half its capacity. </p><p><strong>Georgia</strong></p><p>Georgia Power has spent years amassing electric capacity for data centers, as <a href="https://www.isambrooks.com/p/why-isnt-microsoft-using-georgias">I wrote here</a>. Microsoft alone is <a href="https://psc.ga.gov/search/facts-document/?documentId=227753">on the utility&#8217;s books</a> for 1,157 MW of power this year, across six data centers with signed contracts for electric service. Some have been plugged in since 2024, including Fairwater, the project that Microsoft calls part of a &#8220;planet-scale AI superfactory.&#8221;</p><p><a href="https://www.eia.gov/electricity/data/eia861m/">Through August</a>, Georgia Power&#8217;s entire commercial sector (Microsoft, every other data center, and every office, store, and hospital) averaged just 388 MW more than a year earlier. If Georgia Power&#8217;s  data centers were running anywhere near their available capacity, it would show up on the utility&#8217;s meter. It doesn&#8217;t. </p><p><strong>Power Traders</strong></p><p><a href="https://www.yesenergy.com">Yes Energy</a> sells power-market data to hedge funds and commodity traders. It tracked the power flowing on transmission lines that feed data centers, including Oracle&#8217;s Project Abilene. <a href="https://www.yesenergy.com/blog/what-does-a-hyperscale-data-center-really-look-like">Its advice to traders</a>:</p><blockquote><p>&#8220;&#8230; [L]oads from these facilities are not ramping at the reported levels. If you&#8217;re building a model, we recommend using 50% or 60% of the reported capacity as the actual load.&#8221;</p></blockquote><p>The people who watch power flows for a living, and who lose money when they get them wrong, say the AI factories utilize about half their power.</p><div><hr></div><h3>In Their Own Reports</h3><p>&#8220;Nvidia Compute is fully utilized,&#8221; CFO Colette Kress <a href="https://seekingalpha.com/article/4940563-nvidia-corporation-nvda-q2-2027-earnings-call-transcript">told investors</a> in August, after saying in February that Nvidia&#8217;s newest chips were all &#8220;deployed and consumed.&#8221; That&#8217;s a lot of chips to vouch for. <a href="https://epoch.ai/data/ai-chip-sales">Per Epoch AI</a>, Nvidia makes about two-thirds of the world&#8217;s AI chips (measured by power), and total sales come to about 19 GW.</p><p>If all these chips were deployed and consumed in AI factories, the buyers&#8217; own power numbers would show it. They don&#8217;t. Most big tech companies publish their electricity use once a year, in sustainability reports that weren&#8217;t written to say how hard their AI factories are running &#8212; but the numbers are in there anyway.</p><p><strong>Microsoft</strong> is a clear case, because its CEO keeps putting a number on its factory capacity.  &#8220;We stood up more than 2 gigawatts of new capacity over the past 12 months alone,&#8221; Satya Nadella <a href="https://seekingalpha.com/article/4806519-microsoft-corporation-msft-q4-2025-earnings-call-transcript">said in July 2025</a>. In <a href="https://cdn-dynmedia-1.microsoft.com/is/content/microsoftcorp/microsoft/msc/documents/presentations/CSR/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf#page=6">Microsoft&#8217;s most recent sustainability report</a>, which covers those same 12 months, company-wide electricity use rose about 830 MW. Some of that went to Microsoft&#8217;s non-AI business, so the AI chips got less than that. Either way, it&#8217;s not even close to the 2,000 MW (2 GW) Nadella claimed.</p><p><strong>Meta</strong>&#8217;s <a href="https://sustainability.atmeta.com/asset/2025-environmental-data-index/#page=6">sustainability report</a> for 2024 shows its data center chips drawing about 320 MW more than the year before &#8212; less than half the chip power <a href="https://epoch.ai/data/ai-chip-owners">Epoch estimates</a> Meta installed that year. (Meta still hasn&#8217;t released its report for 2025.)</p><p><strong>Google</strong>&#8217;s <a href="https://sustainability.google/files/1699a2e19277e478b38a659f00cb38398a836e8c/download-1699a2e1.pdf#page=93">chips in data centers</a> drew about 1,240 MW more in 2025 than in 2024 &#8212; less than half the chip power Epoch says Google installed that year.</p><p><a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-5" href="#footnote-5" target="_self">5</a></p><div><hr></div><h3>The National Meter</h3><p>Running flat out, the AI chips added in American data centers in the 12 months through August &#8212; plus their servers and cooling, minus the sites off the grid &#8212; would pull about 9 GW from the grid.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-6" href="#footnote-6" target="_self">6</a> </p><p>Over those same 12 months, every business in America combined (all offices, steel mills, bitcoin mines, and data centers) <a href="https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_1">added only 6.5 GW</a> of power demand.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-7" href="#footnote-7" target="_self">7</a> With an allowance for everything else that grew &#8212; a <a href="https://s27.q4cdn.com/273397814/files/doc_financials/2025/q4/SO-2025-Q4-Earnings-Call-Final.pdf#page=12">bigger economy</a> (~2 GW) and <a href="https://www.census.gov/data/tables/2024/econ/aies/2024-aies-tables.html">manufacturing coming back onshore</a> (~1 GW) &#8212; that leaves 3 to 4 GW of new demand from AI data centers. In other words, the new AI chips were pulling less than half of what they could.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!4bU6!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!4bU6!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png 424w, https://substackcdn.com/image/fetch/$s_!4bU6!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png 848w, https://substackcdn.com/image/fetch/$s_!4bU6!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!4bU6!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!4bU6!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png" width="1456" height="1092" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1092,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:307164,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/221652393?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!4bU6!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png 424w, https://substackcdn.com/image/fetch/$s_!4bU6!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png 848w, https://substackcdn.com/image/fetch/$s_!4bU6!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!4bU6!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F251388ba-72e4-42ca-a83b-225568789aa2_3200x2400.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><div><hr></div><h3>One Number Away</h3><p>Most people in the AI industry learned how business works from software, which is basically the opposite of a factory company. Almost no capital expenditures, not a factory in sight. So perhaps it&#8217;s not surprising that AI companies don&#8217;t disclose the utilization of their chips.</p><p>Musk doesn&#8217;t have that excuse: Tesla is a factory company, and <a href="https://www.sec.gov/Archives/edgar/data/1318605/000162828026066738/exhibit9914.htm">it reports like one</a>. Each quarter, it tells investors how many cars its factories actually built, versus how many they could build &#8212; lately, about 81% for its Model 3 and Model Y lines &#8212; and says it&#8217;s &#8220;optimizing our existing production capacity before building new factories and production lines.&#8221; The first line of its latest quarterly outlook: &#8220;We are focused on maximum capacity utilization at our factories.&#8221;</p><div class="captioned-image-container"><figure><div class="image-link image2" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!IVq2!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png 424w, https://substackcdn.com/image/fetch/$s_!IVq2!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png 848w, https://substackcdn.com/image/fetch/$s_!IVq2!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png 1272w, https://substackcdn.com/image/fetch/$s_!IVq2!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!IVq2!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png" width="1278" height="290" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:290,&quot;width&quot;:1278,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:106689,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/221652393?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!IVq2!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png 424w, https://substackcdn.com/image/fetch/$s_!IVq2!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png 848w, https://substackcdn.com/image/fetch/$s_!IVq2!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png 1272w, https://substackcdn.com/image/fetch/$s_!IVq2!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7bfc7bf2-b1ef-45c1-8d42-3a6af702927e_1278x290.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div></div></div></div><figcaption class="image-caption">Musk&#8217;s Tesla focuses on factory basics; Musk&#8217;s xAI, not so much.</figcaption></figure></div><p>Musk&#8217;s SpaceX has tiptoed up to the line. In its SEC filings, it publishes the chip number cited earlier (1.7 GW in Q3; 1.4 GW in Q2) and <a href="https://www.sec.gov/Archives/edgar/data/1181412/000162828026066880/spcx-20260930.htm">calls it</a> &#8220;nameplate compute&#8221;: &#8220;the number of GPUs installed in our data centers at the end of the period multiplied by their respective all-in power.&#8221; Then it adds that the figure &#8220;does not represent actual power consumption or utilization.&#8221;</p><p>It&#8217;s so close. One more number &#8212; what the chips are drawing &#8212; and it&#8217;s simple division to get the AI factory&#8217;s utilization, a figure to put next to Nucor&#8217;s 89% and Tesla&#8217;s 81%. The number would take less space than the disclaimer. </p><p>On SpaceX&#8217;s recent earnings call, the same one where Musk was &#8220;highly confident&#8221; of 10 GW next year, <a href="https://seekingalpha.com/article/4955677-space-exploration-technologies-corp-spcx-q3-2026-earnings-call-transcript">he said</a>:</p><blockquote><p>&#8220;You don&#8217;t hear a lot of detail from other hyperscalers about how many GPUs <strong>they&#8217;re actually turning on every month</strong>. And with us, you are.&#8221; (Emphasis added.)</p></blockquote><p>Except, we&#8217;re not. Musk is talking about how much <em>could be</em> turned on, not how much <em>actually is. </em>It&#8217;s like Tesla announcing it can build 2.25 million cars per year, and then never saying how many it built. The first number is useful, but without the output you only see half the picture.</p><p>Real factory companies report everything. But nobody in the AI industry &#8212; not Musk, nor Anthropic, not the planet-scale superfactory people &#8212; will talk about their factories&#8217; utilization. They&#8217;ll tell you all about the next ten factories, but nothing about the ones already built. </p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/subscribe?&quot;,&quot;text&quot;:&quot;Subscribe now&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/subscribe?"><span>Subscribe now</span></a></p><div><hr></div><h3><strong>SOON</strong></h3><p>The electric utilities are building power plants as if every one of these factories will run flat out. Got a GW-sized plan for a data center? You get a GW-sized power plant. </p><p>This could have catastrophic consequences. For these utilities, or our power bills, or both. </p><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-1" href="#footnote-anchor-1" class="footnote-number" contenteditable="false" target="_self">1</a><div class="footnote-content"><p>Polaris Forge is a good example because of its underutilization, but also because of something else that will hurt the feelings of AI boosters: it&#8217;s had plenty of power for years &#8212; power it&#8217;s not even using.</p><p>If you listen to ten minutes of any tech podcast or financial-news segment on AI data centers (sorry, factories), you&#8217;ll hear it: power is the bottleneck. From the last two weeks alone: Goldman&#8217;s Jason Tofsky, &#8220;Power is probably the forever bottleneck&#8221; (Axios, 10/20/26); investor Brad Gerstner, &#8220;it&#8217;s only so fast that we can bring power on&#8221; (CNBC, 10/21/26); Blackstone&#8217;s Jon Gray, &#8220;getting entitlements, getting power&#8221; (Blackstone Q3 call, 10/22/26).</p><p>It. Never. Ends. And it&#8217;s not true. There is no shortage of power for AI factories.</p><p>Just look at Georgia Power, which got approval in 2025 to keep 4,200 MW of old plants running and to add another 9,885 MW of generation. Its CEO says it&#8217;s not enough. By Georgia Power&#8217;s own count, all of its data center customers &#8212; every single one of them combined &#8212; had added 612 MW by the end of last year. I&#8217;m nearly certain OpenAI could plug in its Project Camellia (3,200 MW) next year, no problem.</p><p>The real risk is the opposite: too much power amassed for factories that aren&#8217;t using it. This page will get into all of that soon; you should subscribe!</p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/subscribe?&quot;,&quot;text&quot;:&quot;Subscribe now&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/subscribe?"><span>Subscribe now</span></a></p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-2" href="#footnote-anchor-2" class="footnote-number" contenteditable="false" target="_self">2</a><div class="footnote-content"><p>Who does what at Polaris Forge: </p><ul><li><p>Anthropic, among others, rents time on the factory&#8217;s chips. </p></li><li><p>But Anthropic doesn&#8217;t own the chips. <strong>CoreWeave</strong> does. </p></li><li><p>But CoreWeave doesn&#8217;t own the buildings that house the chips. <strong>Applied Digital</strong> does.</p></li><li><p>But Applied Digital doesn&#8217;t own the power line that feeds the buildings. <strong>Montana-Dakota Utilities (MDU)</strong> does. </p></li><li><p>Nvidia, the company that makes the chips, has invested money in Applied Digital. And in CoreWeave. And in Anthropic. </p></li></ul><p>So Anthropic&#8217;s money, some of which it got from Nvidia, goes to CoreWeave; CoreWeave&#8217;s money goes to Nvidia, for chips that sit in Applied&#8217;s building, which Nvidia helped pay for and CoreWeave rents. And the power running through Nvidia&#8217;s chips, that are owned by CoreWeave, comes from wires owned by MDU, which has an electricity contract with Applied Digital. </p><p>It&#8217;s a shocker this factory isn&#8217;t humming.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-3" href="#footnote-anchor-3" class="footnote-number" contenteditable="false" target="_self">3</a><div class="footnote-content"><p>A note on &#8220;chips.&#8221; The industry&#8217;s numbers &#8212; SpaceX&#8217;s 1.7 GW, Applied&#8217;s 100 MW, Nadella&#8217;s 2 GW, Epoch&#8217;s figures &#8212; are the power the chips draw. Many sources measure the whole building: a utility meter, a gas pipeline, a sustainability report. A building uses more power than its chips, because of cooling and everything else; it&#8217;s typically 10 to 20% more, a ratio called <a href="https://www.google.com/about/datacenters/efficiency/">Power Usage Effectiveness (PUE)</a>. </p><p>For the site and company comparisons, I&#8217;ve converted building-level numbers to chips. When a company publishes its own PUE, I&#8217;ve used that company-specific factor (<a href="https://cdn-dynmedia-1.microsoft.com/is/content/microsoftcorp/microsoft/msc/documents/presentations/CSR/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf">Microsoft 1.17</a>, <a href="https://www.google.com/about/datacenters/efficiency/">Google 1.09</a>, <a href="https://sustainability.atmeta.com/asset/2025-environmental-data-index/">Meta 1.08</a>, <a href="https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-24-000175/investorpresentationfina.htm">Applied Digital</a> 1.2); otherwise, I&#8217;ve used 1.2. </p><p>&#8220;Installed that year,&#8221; for Meta and Google, means the increase in installed AI chips from the end of one year to the end of the next, <a href="https://epoch.ai/data/ai-chip-owners">calculated from Epoch&#8217;s data</a> (about 770 MW for Meta in 2024 and about 2,900 MW for Google in 2025, counting the chips and their servers). This is similar to Nadella&#8217;s &#8220;2 gigawatts over the past 12 months,&#8221; which meant capacity added over a year.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-4" href="#footnote-anchor-4" class="footnote-number" contenteditable="false" target="_self">4</a><div class="footnote-content"><p>A visualization of my methodology and Colossus 2&#8217;s power flows:</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!5vh1!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!5vh1!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png 424w, https://substackcdn.com/image/fetch/$s_!5vh1!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png 848w, https://substackcdn.com/image/fetch/$s_!5vh1!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!5vh1!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!5vh1!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png" width="1456" height="1456" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1456,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:479903,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/221652393?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!5vh1!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png 424w, https://substackcdn.com/image/fetch/$s_!5vh1!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png 848w, https://substackcdn.com/image/fetch/$s_!5vh1!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!5vh1!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F82d228ca-5389-4991-9865-b0c1690745c5_2400x2400.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><p>June&#8217;s estimate multiplies each <a href="https://rachelandthecity.com/the-xai-files/records/upcoming-hearing/mzx-runtime-table-2026-07-10.pdf">turbine&#8217;s listed output by its reported running hours</a>. September 30&#8217;s estimate converts 247,830 MMBtu of pipeline gas at 11,100 Btu per kilowatt-hour, which is the heat rate implied by comparing the June runtime data and gas data. Both figures remove cooling and other overhead using a 1.2 ratio. </p><p>Colossus 2&#8217;s capacity is SpaceX&#8217;s total &#8212; <a href="https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm">1,400 MW</a> at the end of June, <a href="https://www.sec.gov/Archives/edgar/data/1181412/000162828026066880/spcx-20260930.htm">1,700 MW</a> at the end of September &#8212; less about 320 MW at Colossus 1, calculated from the chip counts <a href="https://x.com/elonmusk/status/2103329761690865846">Musk posted on X</a> at the power per chip <a href="https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm">SpaceX reports</a>. </p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-5" href="#footnote-anchor-5" class="footnote-number" contenteditable="false" target="_self">5</a><div class="footnote-content"><p><strong>Microsoft</strong>. Nadella&#8217;s claim covers Microsoft&#8217;s fiscal 2025: July 2024 through June 2025. Microsoft&#8217;s own environmental data sheet puts company-wide electricity at 29.8 million MWh in fiscal 2024 and 37.0 million in fiscal 2025 &#8212; an increase of about 830 MW of average power. That accounts for everything Microsoft runs, owned and leased, not just AI chips. (The same sheet lists Microsoft&#8217;s owned data centers one by one; they add up to about 16 million of the 37 million MWh, so the leased sites are in the total.) Microsoft&#8217;s reported PUE of 1.17 means the chips&#8217; share is about 710 MW. Microsoft was adding 300&#8211;500 MW a year before ChatGPT existed, as Azure and the rest of the business grew, so the AI chips&#8217; share is less than 710 MW. I don&#8217;t have the exact number, but it&#8217;s <em>nowhere near</em> 2,000 MW.</p><p><strong>Meta</strong>. Meta&#8217;s <a href="https://sustainability.atmeta.com/asset/2025-environmental-data-index/#page=6">environmental data index</a> puts its data centers&#8217; electricity at 14.98 million MWh in 2023 and 18.06 million in 2024, including owned and leased sites &#8212; an increase of about 350 MW of average power. Applying Meta&#8217;s reported PUE of 1.08 means the chips&#8217; share is about 320 MW. That figure includes all its computing, not just AI. Even before ChatGPT, Meta&#8217;s computing demand was growing by about 230 MW a year, on average, from 2020 to 2022. So the added demand from AI chips for 2024 was roughly 100 MW.</p><p><strong>Google</strong>. Google&#8217;s <a href="https://sustainability.google/files/1699a2e19277e478b38a659f00cb38398a836e8c/download-1699a2e1.pdf#page=93">environmental report</a> puts its data-center electricity use at 30.6 million MWh in 2024 and 42.4 million in 2025, including owned and leased sites &#8212; an increase of about 1,350 MW of average power. Applying Google&#8217;s reported PUE of 1.09 means the chips&#8217; share is about 1,240 MW. That figure includes all its computing, not just AI. Even before ChatGPT, Google&#8217;s computing demand was growing by about 320 MW a year, on average, from 2020 to 2022. So the added demand from AI chips for 2025 was roughly 900 MW. </p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-6" href="#footnote-anchor-6" class="footnote-number" contenteditable="false" target="_self">6</a><div class="footnote-content"><p>&#8220;9 GW&#8221;: This number runs the other way from the rest of the piece &#8212; up to the building, not down to the chips &#8212; because it&#8217;s compared with what the grid delivered. <a href="https://epoch.ai/data/ai-chip-sales">Epoch estimates</a> the AI chips in use worldwide, averaged over the 12 months through August, were about 7.3 GW higher than the 12 months before, counting the chips alone and allowing three months between purchase and plug-in. Epoch also estimates that about 72% of the world&#8217;s AI computing is in the U.S. (5.3 GW). After accounting for the servers (1.7x) and the cooling (1.2x) a data center uses, the total load would be roughly 10.7 GW. I estimate about 1.5 GW of that is at off-grid sites (mostly Colossus 2), so I subtract that from possible grid impact.</p><p>7.3 &#215; 72% = 5.3 GW; * 1.7 [servers] * 1.2 [buildings]  = 10.7 GW; &#8722; 1.5 [off the grid] = 9.2 GW</p><p>That&#8217;s what the grid would have delivered if every new chip ran flat out.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-7" href="#footnote-anchor-7" class="footnote-number" contenteditable="false" target="_self">7</a><div class="footnote-content"><p>&#8220;6.5 GW&#8221;: Energy Information Administration (EIA) data, <a href="http://eia.gov/electricity/data/eia861m">Form EIA-861M</a>, comparing the 12 months through August 2026 against the 12 months before (converted to average power).</p><p><strong>RE 6.5 GW &#8594; 3 - 4 GW:</strong> </p><p>Business demand moves every year &#8212; as the economy grows, demand among stores and offices grows, too &#8212; so I&#8217;ve tried to account for this before crediting any growth to AI chips. <a href="https://s27.q4cdn.com/273397814/files/doc_financials/2025/q4/SO-2025-Q4-Earnings-Call-Final.pdf#page=12">Southern Company, one of the country&#8217;s biggest utilities, says</a> its commercial sales grew about 1% last year excluding data centers. To simplify things, I&#8217;ve used Southern Company&#8217;s figures as a proxy for the national trend: 1% of U.S. business sales outside of manufacturing and data centers (~180 GW total) is roughly 1.8 GW. </p><p>Manufacturing is also pulling more power. <a href="https://www.census.gov/data/tables/2024/econ/aies/2024-aies-tables.html">The Census Bureau&#8217;s survey</a> of manufacturers reports total demand of about 80 GW. <a href="https://www.federalreserve.gov/releases/g17/current/">The Federal Reserve reports</a> manufacturing output grew about 1% over the past year, so manufacturing accounts for roughly .8 GW of the country&#8217;s added demand. (The same Fed report publishes factory utilization every month (76% in September), because that&#8217;s what real factory data looks like.)</p><p>6.5 - 1.8 [non-AI business demand growth] - .8 [non-AI manufacturing demand growth] = 3.9 GW</p><p>I haven&#8217;t accounted for bitcoin mining or EV charging, both of which probably grew; so, if anything, the AI share may be closer to 3 GW.</p><p>Note that these numbers are not weather-normalized. I&#8217;ve examined weather in detail (I&#8217;ve got a weather normalization model and everything), and if anything it makes AI chip demand look bigger than it is. This August was unusually hot, which nudged demand up, so part of the 6.5 GW of added demand is likely from weather. But the effect is small; and weather moves businesses far less than homes; and it barely moves industrial facilities, including data centers; and weather modeling gets tricky across different climates; and weather effects wash out over a long enough time series. So I left it out.</p></div></div>]]></content:encoded></item><item><title><![CDATA[Why Isn’t Microsoft Using Georgia’s Power? ]]></title><description><![CDATA[Georgia Power has spent years amassing infrastructure &#8212; enough substations and plants for a small country &#8212; to power AI chips. Why aren&#8217;t data centers using it?]]></description><link>https://www.isambrooks.com/p/why-isnt-microsoft-using-georgias</link><guid isPermaLink="false">https://www.isambrooks.com/p/why-isnt-microsoft-using-georgias</guid><dc:creator><![CDATA[SAM BROOKS]]></dc:creator><pubDate>Wed, 21 Oct 2026 17:58:51 GMT</pubDate><enclosure url="https://substack-post-media.s3.amazonaws.com/public/images/33faaf83-ab8c-49c8-9e36-7543fae81459_1024x612.jpeg" length="0" type="image/jpeg"/><content:encoded><![CDATA[<p><em>If only we had more electricity</em>! </p><p>The AI crowd always comes back to the same story: demand is huge &#8212; <a href="https://seekingalpha.com/article/4885484-arm-holdings-plc-arm-shareholder-analyst-call-prepared-remarks-transcript">it&#8217;s basically infinite</a> &#8212; but there&#8217;s not enough electricity to power the chips. As Microsoft CEO Satya Nadella <a href="https://www.youtube.com/watch?v=Gnl833wXRz0&amp;t=1086s">explained last October</a>:</p><blockquote><p>&#8220;The biggest issue we are now having is not a compute glut, but it&#8217;s power &#8230; In fact, that is my problem today. It&#8217;s not a supply issue of chips; it&#8217;s actually the fact that I don&#8217;t have warm shells to plug into.&#8221;</p></blockquote><p>We&#8217;re told that Microsoft, with all of its money and chips, is stuck waiting for electricity. <a href="https://seekingalpha.com/article/4835092-microsoft-corporation-msft-q1-2026-earnings-call-transcript">CFO Amy Hood said</a> last fall they&#8217;d &#8220;spent the past few years &#8230; short the space or the power&#8221; to run AI chips, and <a href="https://seekingalpha.com/article/4896208-microsoft-corporation-msft-q3-2026-earnings-call-transcript">this April</a> she said Microsoft expected &#8220;to remain constrained at least through 2026.&#8221; To Nadella, Hood, and every other concerned AI booster, allow me to share the good news: </p><p><strong>Tons of power is available in Georgia &#8212; and has been for years.</strong></p><p>Georgia Power <a href="https://psc.ga.gov/search/facts-document/?documentId=227753">recently listed</a> ten data centers with signed contracts and gigawatts of available electric service (I&#8217;ve identified at least half as Microsoft&#8217;s).<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-1" href="#footnote-1" target="_self">1</a> </p><p><strong>Now the bad news: the data centers are barely using it.</strong>   </p><div class="callout-block" data-callout="true"><p>There are only two ways to explain this. Both are bad for Microsoft and for Georgia Power:</p><ol><li><p><strong>Many AI chips are still in warehouses, not data centers. </strong>That&#8217;s what Ed Zitron&#8217;s been arguing, and what <a href="https://www.businessinsider.com/amazon-220-billion-ai-bet-data-centers-spending-challenges-2026-10">Business Insider just reported</a> at Amazon.</p></li><li><p><strong>AI chips are installed at the data centers</strong> <strong>&#8212; but underused.</strong> That&#8217;s what I found at Colossus 2, <a href="https://www.isambrooks.com/p/wheres-the-ai-power-boom">which you can read about here</a>. </p></li></ol><p>Either way, hyperscalers are spending billions of dollars on computer chips they&#8217;re not using &#8212; and electric utilities are spending billions of dollars on power plants that won&#8217;t be used.</p></div><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/subscribe?&quot;,&quot;text&quot;:&quot;Subscribe now&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/subscribe?"><span>Subscribe now</span></a></p><div><hr></div><h3>How It Started</h3><p>In a <a href="https://assets.swoogo.com/uploads/1649133-6230c1b765938.pdf">January 2022 employee newsletter</a>, Georgia Power celebrated three Microsoft data center &#8220;wins,&#8221; resulting from a &#8220;system-wide innovative and collaborative effort&#8221; that&#8217;d been six years in the making. The utility was building infrastructure to deliver 590 MW to the three sites, and expected &#8220;to energize the substations for these centers during Q2 2023.&#8221; </p><p>By 2024, Georgia Power was talking in entire power plants. After <a href="https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/218484/99572#page=14">state regulators approved</a> 1,400 MW of new gas turbines that spring, Chris Womack, CEO of Southern Company (Georgia Power&#8217;s parent), <a href="https://seekingalpha.com/article/4688670-the-southern-company-so-q1-2024-earnings-call-transcript">told investors</a>: &#8220;This approval affirms the need to quickly procure and deploy several thousand megawatts of resources to serve customers&#8217; rapidly growing projected electricity demands.&#8221; </p><p>The utility next sought to keep a fleet of old power plants, over 4,000 MW of them, running into the 2030s. Regulators <a href="https://www.georgiapower.com/news-hub/press-releases/georgia-public-service-commission-approves-plan-to-meet-the-energy-needs-of-a-growing-georgia.html">said yes</a> in July 2025, then <a href="https://psc.ga.gov/site/assets/files/9176/media_advisory_dec_19_decision.pdf">said yes again</a> five months later to 9,885 MW of new power capacity. Georgia Power had been green-lit for enough plants <a href="https://www.ren.pt/en-gb/repository/noticias/news/portugal-records-new-peak-electricity-consumption-figures-this-summer">to power Portugal</a>.</p><p>By this January, Womack was making the rounds in Davos. He spoke to a Boston Consulting Group gathering where one of the firm&#8217;s partners <a href="https://www.linkedin.com/posts/maurice-berns_davos-bcgonenergy-bcghendersoninstitute-activity-7419444180667592706-gT2n/">reported</a> &#8220;significant optimism in the room&#8221; about &#8220;partnerships between hyperscalers and utilities.&#8221; While in the Alps, Womack summed things up <a href="https://www.bloomberg.com/news/videos/2026-01-20/southern-ceo-womack-on-power-demands-trump-s-pjm-plan-video">for Bloomberg:</a> </p><blockquote><p>&#8220;We&#8217;re seeing incredible growth, incredible demand, incredible opportunity to serve these data center customers, which is an incredible opportunity that we&#8217;re really excited about.&#8221; </p></blockquote><p>It doesn&#8217;t take a <a href="https://www.gsaadvantage.gov/advantage/ws/search/advantage_search?searchType=2&amp;q=0:847QRAA21D00AU">$1,271-an-hour consultant</a> to figure out what&#8217;s so exciting: if data centers say they&#8217;ll use lots of electricity, the utility can <a href="https://www.georgiapower.com/about/company/filings.html">make lots of money</a> by building lots of power plants.</p><div><hr></div><p>Georgia Power tallies the AI boom&#8217;s demand &#8212; to justify building all the new supply &#8212; and publishes the figures in public (ish) regulatory documents. </p><p>In quarterly &#8220;Large Load&#8221; reports first filed <a href="https://psc.ga.gov/search/facts-document/?documentId=218694">in May 2024</a>, the utility redacts individual customer names,<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-2" href="#footnote-2" target="_self">2</a> but all the details are there. In row after row: project size, contract status, when service can begin, and scheduled MW by year. That first report listed 64 anonymous projects &#8212; 37 of them data centers, by my count &#8212; with the data centers scheduled to draw 1,438 MW in 2025 and 3,854 MW in 2026. The list has ballooned since. </p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!N187!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!N187!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png 424w, https://substackcdn.com/image/fetch/$s_!N187!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png 848w, https://substackcdn.com/image/fetch/$s_!N187!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!N187!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!N187!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png" width="1456" height="1456" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1456,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:278111,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/220017231?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!N187!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png 424w, https://substackcdn.com/image/fetch/$s_!N187!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png 848w, https://substackcdn.com/image/fetch/$s_!N187!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!N187!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5c0aecdd-aa6b-44d5-b7a2-7d310749922e_2400x2400.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><p>The <a href="https://psc.ga.gov/search/facts-document/?documentId=227753">August 2026 report</a> lists 108 data centers: 19 with a signed &#8220;Contract for Electric Service&#8221; (9,149 MW total demand), 8 with a signed &#8220;Request for Service&#8221; (5,811 MW), and 81 in &#8220;Technical Review&#8221; (62,707 MW).<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-3" href="#footnote-3" target="_self">3</a></p><div class="callout-block" data-callout="true"><h3>About all this data &#8230; </h3><p>There&#8217;s a reason this analysis doesn&#8217;t exist anywhere else. Two, actually:</p><p><strong>The data.</strong> Footnote 2 details how I assembled this data &#8212; project sizes, phasing, contract status &#8212; from the eleven Large Load reports. I&#8217;ll simply note here that a conspiracy theorist might conclude Georgia Power releases the data in disorganized PDFs and Excel files for a reason: to make it nearly impossible to track. (That&#8217;s what I&#8217;ve concluded.)</p><p><strong>The customers.</strong> I've cross-referenced that database against hundreds of publicly available documents to identify many of the rows&#8217; customers and data centers.</p><p>Sometimes it&#8217;s easy. Exhibit A: OpenAI&#8217;s Project Camellia, <a href="https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/">announced in July</a> as &#8220;contracting with Georgia Power Company for 3.2 gigawatts of power &#8230; in phases between 2028 and 2032.&#8221; <a href="https://psc.ga.gov/search/facts-document/?documentId=227753">In Georgia Power&#8217;s August report</a>, one customer, name redacted, is listed with a &#8220;Request for Service&#8221; for 3,210 MW (i.e., 3.2 gigawatts) phased in between 2028 and 2032.</p><p>Microsoft&#8217;s data centers required more digging (see Footnote 1 for a thousand words on how I pinpointed things), but the short version is that I triangulated Georgia Power's paperwork against itself: the eleven Large Load reports, grid plans and equipment filings and press releases, and one <a href="https://assets.swoogo.com/uploads/1649133-6230c1b765938.pdf">very proud employee newsletter</a>.</p><p><em>Given that a critic of Georgia Power <a href="https://georgiarecorder.com/wp-content/uploads/2026/01/decline-durand-patricia-25PI008694.pdf#page=1">spent nearly two days in a Fulton County jail</a> for picking up the wrong binder at a hearing (she was suspected of a "trade secrets" felony), let me be clear: everything in this article has come from public documents.</em></p></div><div><hr></div><h3><strong>How It&#8217;s Going</strong></h3><p>By all accounts, Georgia was supposed to be humming with data center demand by 2026.</p><ul><li><p><a href="https://www.georgiapower.com/content/dam/georgia-power/pdfs/company-pdfs/2023-irp-update-main-document.pdf#page=5">Georgia Power&#8217;s power-plant plan</a> said so (Oct 2023): &#8220;to address this extraordinary load growth, the Company must procure resources to support capacity needs beginning in the winter of 2025/2026&#8221;</p></li><li><p><a href="https://seekingalpha.com/article/4670698-the-southern-company-so-q4-2023-earnings-call-transcript">Southern&#8217;s CFO</a> said so (Feb 2024): &#8220;the significant load really begins to come in, say, late 2025 and into 2026&#8221;</p></li><li><p><a href="https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/218484/99572#page=14">State regulators</a> said so (April 2024): &#8220;urgent capacity needs&#8221; &#8212; so urgent they let Georgia Power skip competitive bidding for new turbines</p></li><li><p><a href="https://seekingalpha.com/article/4688670-the-southern-company-so-q1-2024-earnings-call-transcript">CEO Womack</a> said so (May 2024): &#8220;rapidly growing projected electricity demands by the winter of 2026&#8221;</p></li><li><p><a href="https://psc.ga.gov/search/facts-document/?documentId=220461">Georgia Power&#8217;s Q3 2024 data center report</a> said so (Nov 2024): &#8220;large load customers are materializing and making progress without material delays&#8221;</p></li><li><p><a href="https://psc.ga.gov/search/facts-document/?documentId=222764">Georgia Power&#8217;s Q1 2025 data center report</a> said so (May 2025): 4,445 MW scheduled for 2026</p></li></ul><p>After all that &#8212; the urgency to procure new power plants, and the certainty of the demand to use them &#8212; the meter should be spinning hard by now.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-4" href="#footnote-4" target="_self">4</a></p><p>But it&#8217;s barely spinning at all. </p><p>In <a href="https://www.eia.gov/electricity/data/eia861m/">monthly filings</a> with the federal government, Georgia Power reports how much power it sells, including to its &#8220;commercial&#8221; customers, a group that includes its data centers. Through July of this year, the entire group &#8212; every office, store, and hospital it serves, plus the data centers &#8212; is using an average of 332 MW more power than the same months in 2025. Across the last two years, the entire commercial sector is up just 492 MW.</p><p>492 MW.</p><p>Even if we make the (bad) assumption that all 492 MW are data centers, that&#8217;s a big gap from the 4,445 MW of data center power Georgia Power expected in 2026, in its forecast filed just last year.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-5" href="#footnote-5" target="_self">5</a></p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!qW0J!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!qW0J!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png 424w, https://substackcdn.com/image/fetch/$s_!qW0J!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png 848w, https://substackcdn.com/image/fetch/$s_!qW0J!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!qW0J!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!qW0J!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png" width="1456" height="1456" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1456,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:383502,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/220017231?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!qW0J!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png 424w, https://substackcdn.com/image/fetch/$s_!qW0J!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png 848w, https://substackcdn.com/image/fetch/$s_!qW0J!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!qW0J!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4f70dfd0-fa75-40a0-8854-9a403fc27be7_2400x2400.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><div class="callout-block" data-callout="true"><p>That&#8217;s a lot of numbers. Shout out to the Rain Men breezing along, but in plain English: </p><p><strong>Georgia Power is ready to supply a ton of power &#8212; but the data centers aren&#8217;t using it.</strong></p></div><div><hr></div><h3><strong>Warm Shells</strong></h3><p>It&#8217;s not like Microsoft disputes the power is on. Last December, <a href="https://azure.microsoft.com/en-us/blog/microsofts-commitment-to-supporting-cloud-infrastructure-demand-in-the-united-states/">Microsoft boasted</a>: &#8220;Our datacenter footprint in Greater Atlanta Metro area is already running the most advanced AI supercomputers on the planet.&#8221; In a January 2024 filing, <a href="https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/217068/98288">the firm described</a> itself as &#8220;a large consumer of Georgia Power with particularized needs for electric service.&#8221;</p><p>Georgia Power&#8217;s been meeting these particular data center needs for years.  I&#8217;ve pinned down six Microsoft data centers on the utility&#8217;s Large Load reports:</p><ul><li><p>Fairwater, which Microsoft <a href="https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/">calls</a> &#8220;the world&#8217;s first planet-scale AI superfactory,&#8221; contracted for 1,429 MW</p></li><li><p>Microsoft&#8217;s campus in Union City, built by EdgeConneX (324 MW)</p></li><li><p>Shugart (240 MW), Riverside West (192 MW), East Point (180 MW), plus another 240 MW project</p></li></ul><p>All six of these data centers have signed &#8220;Contracts for Electric Service.&#8221; All six have an &#8220;Initial In Service Date&#8221; that&#8217;s already arrived; Fairwater&#8217;s service date was <em>two and a half years ago</em>, on April 26, 2024. But despite all of this &#8212; the contracts, and the substations, and the power plants &#8212; there&#8217;s one unavoidable fact:</p><p>The data centers aren&#8217;t actually <em>using</em> much power. </p><p>I know that because Georgia Power&#8217;s entire commercial sector, which includes every other data center on its system, is on pace to add just 332 MW this year. <a href="https://psc.ga.gov/search/facts-document/?documentId=227753">Two months ago</a>, Georgia Power still expected Microsoft alone to use 1,157 MW this year. </p><p>Satya should feel free to plug in. The shells are warm &#8212; and unused.</p><div><hr></div><p style="text-align: center;"><em>If you like this post (tbh even if you don&#8217;t), I&#8217;d be eternally grateful if you&#8217;d share it far and wide!</em> </p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/p/why-isnt-microsoft-using-georgias?utm_source=substack&utm_medium=email&utm_content=share&action=share&quot;,&quot;text&quot;:&quot;Share&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/p/why-isnt-microsoft-using-georgias?utm_source=substack&utm_medium=email&utm_content=share&action=share"><span>Share</span></a></p><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-1" href="#footnote-anchor-1" class="footnote-number" contenteditable="false" target="_self">1</a><div class="footnote-content"><p>&#8220;I&#8217;ve identified at least half as Microsoft&#8217;s&#8221;</p><p>Though the customer names on Georgia Power&#8217;s Large Load reports are redacted, I have developed considerable circumstantial evidence &#8212; by cross-referencing the utility&#8217;s reports against each other, and other publicly available documents &#8212; to say <em>with very high confidence</em> that five of the ten data centers with signed contracts and live service dates are Microsoft&#8217;s, and a sixth almost certainly is. </p><p>In Georgia Power&#8217;s Large Load reports, the first four columns &#8212; &#8220;Project Name,&#8221; &#8220;City,&#8221; &#8220;County,&#8221; and &#8220;GPS Coordinates&#8221; &#8212; are marked as REDACTED on every row. The remaining columns are public, and five hold keys to piecing things together:</p><ul><li><p>&#8220;Announced Load&#8221;: the customer&#8217;s fully planned power demand (MW).</p></li><li><p>&#8220;Initial In Service Date&#8221;: the date on which a customer&#8217;s electricity can begin to flow.</p></li><li><p>Annual: the amount of demand Georgia Power assigns to the customer in each year, a figure that rises as a project phases in.</p></li><li><p>&#8220;Project Stage&#8221;: whether the customer is in Technical Review, has signed a Request for Service, or has signed a Contract for Electric Service. These listings sometimes carry footnotes, which sometimes specify that a customer&#8217;s site has contracted for only a portion of its total Announced Load.</p></li><li><p>&#8220;Territory&#8221;: whether the site is &#8220;Inside&#8221; or &#8220;Outside&#8221; Georgia Power&#8217;s territory. Georgia divides electric-service areas among different utilities, but <a href="https://www.waltonemc.com/business/you-choose/">qualifying large customers</a> can choose their supplier. A data center can therefore sit outside Georgia Power&#8217;s territory and still buy its electricity from Georgia Power; such a data center would be listed as &#8220;Outside.&#8221;</p></li></ul><div class="captioned-image-container"><figure><div class="image-link image2" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!H7HS!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc73e205c-4d62-4f75-877d-c4985727df85_1650x236.png 424w, https://substackcdn.com/image/fetch/$s_!H7HS!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc73e205c-4d62-4f75-877d-c4985727df85_1650x236.png 848w, https://substackcdn.com/image/fetch/$s_!H7HS!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc73e205c-4d62-4f75-877d-c4985727df85_1650x236.png 1272w, https://substackcdn.com/image/fetch/$s_!H7HS!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc73e205c-4d62-4f75-877d-c4985727df85_1650x236.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!H7HS!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc73e205c-4d62-4f75-877d-c4985727df85_1650x236.png" width="1456" height="208" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/c73e205c-4d62-4f75-877d-c4985727df85_1650x236.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:208,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:125136,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/220017231?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc73e205c-4d62-4f75-877d-c4985727df85_1650x236.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!H7HS!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc73e205c-4d62-4f75-877d-c4985727df85_1650x236.png 424w, https://substackcdn.com/image/fetch/$s_!H7HS!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc73e205c-4d62-4f75-877d-c4985727df85_1650x236.png 848w, https://substackcdn.com/image/fetch/$s_!H7HS!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc73e205c-4d62-4f75-877d-c4985727df85_1650x236.png 1272w, https://substackcdn.com/image/fetch/$s_!H7HS!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc73e205c-4d62-4f75-877d-c4985727df85_1650x236.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div></div></div></div></figure></div><div class="captioned-image-container"><figure><div class="image-link image2" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!HL9W!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png 424w, https://substackcdn.com/image/fetch/$s_!HL9W!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png 848w, https://substackcdn.com/image/fetch/$s_!HL9W!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png 1272w, https://substackcdn.com/image/fetch/$s_!HL9W!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!HL9W!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png" width="1456" height="208" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:208,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:171306,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/220017231?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!HL9W!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png 424w, https://substackcdn.com/image/fetch/$s_!HL9W!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png 848w, https://substackcdn.com/image/fetch/$s_!HL9W!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png 1272w, https://substackcdn.com/image/fetch/$s_!HL9W!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F05f5012c-5f74-4283-b36e-1ff4db9c14fd_1650x236.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div></div></div></div></figure></div><p><strong>FAIRWATER</strong></p><p>Georgia Power&#8217;s <a href="https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220948/102128#page=16">2023 transmission plan</a> names QTS Fayetteville as the customer it was building a new substation for, outside its own territory; <a href="https://www.bloomberg.com/news/features/2024-12-08/georgia-s-blackstone-backed-qts-data-center-hits-resistance-over-ai-power-needs">QTS told Georgia Power</a> the campus would need 1.4 GW; <a href="https://www.ajc.com/business/2025/11/microsofts-newest-ai-superfactory-opens-at-sprawling-fayetteville-campus/">Microsoft&#8217;s Fairwater is that QTS campus</a>, and <a href="https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/">it&#8217;s running</a>. In Georgia Power&#8217;s August 2026 report, there are only four data center rows with a signed Contract for Electric Service, with a present In Service date, and that are outside of Georgia Power&#8217;s territory. One has Announced Load of 1,429; the next highest is 240 MW (see: Palmetto, below). This 1,429 row is, without a doubt, Microsoft&#8217;s Fairwater campus.</p><p><strong>SHUGART, RIVERSIDE WEST, SOUTHMEADOW</strong></p><p><a href="https://assets.swoogo.com/uploads/1649133-6230c1b765938.pdf">Georgia Power&#8217;s Jan 2022 Circuit</a> newsletter names three Microsoft data centers by name and size (matched here to their cities): Shugart/Palmetto (240 MW), Riverside West/Douglasville (200 MW), and Southmeadow/East Point (150 MW). It explicitly places each outside the utility&#8217;s territory; Microsoft itself names Douglasville, Palmetto, and East Point in a <a href="https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/217068/98288#page=2">January 2024 regulatory filing</a>.</p><p><strong>Shugart/Palmetto.</strong> By its February 2025 report, Georgia Power had exactly four Outside data centers with a signed Contract for Electric Service (CES): 1,429 (Fairwater), 240, 192 and 180. The 240 perfectly matches the 240 MW Shugart project named in the utility&#8217;s newsletter.</p><p><strong>Riverside West/Douglasville.</strong> In the May 2024 report, one of only two Outside projects with a signed CES (the other was Fairwater, then listed at 1,492) had an Announced Load of 200 MW, perfectly matching the 200 MW Riverside West project identified in the utility&#8217;s newsletter. (Note that in the Nov 2024 report, this project&#8217;s Announced Load shifts from 200 MW to 192 MW.)</p><p><strong>Southmeadow/East Point.</strong> This identification comes from several pieces of evidence that reinforce each other:</p><ul><li><p>In Georgia Power&#8217;s May 2025 Large Load report, there are only four data centers outside of Georgia Power&#8217;s territory with a signed CES: 1,429 (Fairwater); 240 (Shugart); 192 (Riverside West); and then a 180 MW data center. This &#8220;Outside 180&#8221; is thus the obvious candidate to be the East Point data center identified in Georgia Power&#8217;s newsletter.</p></li><li><p><a href="https://eastpointga.new.swagit.com/videos/371848?ts=17690">East Point City Council&#8217;s January 2026</a> meeting confirmed that the Microsoft data center is Georgia Power&#8217;s customer, suggesting that this East Point data center has a CES: &#8220;Remember, we&#8217;re not serving Microsoft&#8221;; &#8220;No, it&#8217;s Georgia Power.&#8221; </p></li><li><p>The Outside 180 row and Microsoft&#8217;s Shugart changed their forecasts in lock-step. In May 2025, their scheduled demand jumped to their full announced loads. Both held there in August, then returned to their previous figures in November&#8217;s report. They were the only two rows, of all the rows in those reports, to follow that pattern. The obvious explanation is the same customer &#8212; Microsoft &#8212; was adjusting its projects.</p></li><li><p>The only mismatch is size: the newsletter listed East Point at 150 MW, while this row shows 180 MW. But planned loads change as projects develop (e.g., Riverside West went from 200 to 192 MW), so East Point could easily have gone from 150 to 180 MW.</p></li></ul><p><strong>UNION CITY</strong></p><p>The <a href="https://psc.ga.gov/search/facts-document/?documentId=227753">August 2026 report</a> lists a customer with an Announced Load of exactly 324 MW, Inside the utility&#8217;s territory, with a signed Contract for Electric Service and an In Service date of June 1, 2026. <a href="https://www.tadigitalgroup.com/news/ta-realty-and-edgeconnex-r-to-develop-324-mw-hyperscale-campus-in-atlanta-ga">EdgeConneX and TA Realty announced</a> a data center project of exactly 324 MW, with the first phase expected to be operational by 2026. <a href="https://www.ajc.com/news/business/new-details-revealed-about-microsofts-18b-data-center-near-atlanta/X7FTPDSJGNAZVNF34XSHTPXS2Y/">Microsoft has confirmed</a> it is the campus&#8217;s end user. The 324-MW row is thus clearly Microsoft&#8217;s Union City project.</p><p><strong>240 MW DATA CENTER</strong></p><p>There&#8217;s a data center &#8212; 240 MW, with a signed Contract for Electric Service and In Service date of Jan 2025 &#8212; whose forecast history clearly links it to Microsoft. </p><p>In the Nov 2024 report, this project and Microsoft&#8217;s Riverside West had identical scheduled demand for four consecutive years: 30, 100, 150 and 175 MW for 2025&#8211;2028. No other row in the entire report had that sequence. Then, in the Feb 2025 report, both changed their phasing &#8212; again with identical matching schedules: 50, 96 and 155 MW for 2026&#8211;2028. Again, no other row in the report had that sequence.</p><p>The obvious explanation: one customer coordinating two sites. Given that I&#8217;ve identified one of the sites as Microsoft&#8217;s Riverside West, I believe the 240 MW row is also Microsoft&#8217;s.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-2" href="#footnote-anchor-2" class="footnote-number" contenteditable="false" target="_self">2</a><div class="footnote-content"><p>To pull the reports yourself, go to the Georgia PSC&#8217;s page for Docket #55378. (<a href="https://psc.ga.gov/search/facts-docket/?docketId=55378">This link should work</a>.) Within the list of documents that&#8217;ll follow, look for the reports titled something resembling &#8220;Large Load Economic Development Report.&#8221; Most have a zip download; from there, open the file whose title begins, &#8220;DKT 55378 Lg Load Econ Dev Rept &#8230;&#8221;. The specific reports are dated: May 15, 2024 (2024 Q1); Aug 16, 2024 (2024 Q2); Nov 18, 2024 (2024 Q3); Feb 21, 2025 (2024 Q4); May 22, 2025 (2025 Q1); Aug 15, 2025 (2025 Q2); Nov 21, 2025 (2025 Q3); Feb 11, 2026 (2025 Q4); Mar 4, 2026 (2025 Q3 and Q4, revised); May 15, 2026 (2026 Q1); Aug 17, 2026 (2026 Q2).</p><p>A final note for anyone who tries this. You&#8217;ll notice that the reports&#8217; zip files come with Excel files. They&#8217;re not that helpful. In the November 2025 and February 2026 files, every row was flagged as changed, because the formulas looked projects up by name, and every name read &#8220;REDACTED,&#8221; so the lookup function didn&#8217;t work. Georgia Power refiled both in March 2026, blaming &#8220;a formula being inadvertently disturbed by the Company&#8217;s redaction process.&#8221; But some of the refiled flags are still wrong, and some changes never appear in the change tables at all. Basically: I don&#8217;t trust those Excel files.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-3" href="#footnote-anchor-3" class="footnote-number" contenteditable="false" target="_self">3</a><div class="footnote-content"><p>Georgia Power&#8217;s August 2026 report lists 118 total &#8220;Large Load&#8221; projects. Ten are factories or clean-energy manufacturing plants. &#8220;Data centers&#8221; throughout means the rows the utility labels &#8220;Data Center/Crypto.&#8221;</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-4" href="#footnote-anchor-4" class="footnote-number" contenteditable="false" target="_self">4</a><div class="footnote-content"><p>You might&#8217;ve assumed that if you say you need more power plants because electricity demand is skyrocketing (as Georgia Power did in 2024) &#8230; and then you get approved to spend tons of money to build those power plants (as Georgia Power did in 2024 and in 2025) &#8230; there&#8217;d be some scrutiny if you came back <em>the very next year</em> and said the same thing (as Georgia Power did in 2025, and as <a href="https://www.prnewswire.com/news-releases/georgia-power-continues-to-plan-for-additional-generation-to-meet-the-energy-needs-of-a-growing-georgia-302752256.html">Georgia Power is doing again now</a>). You might&#8217;ve assumed that someone, somewhere, would check to make sure that skyrocketing demand is happening. (They haven&#8217;t.)</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!5h7q!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!5h7q!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png 424w, https://substackcdn.com/image/fetch/$s_!5h7q!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png 848w, https://substackcdn.com/image/fetch/$s_!5h7q!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png 1272w, https://substackcdn.com/image/fetch/$s_!5h7q!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!5h7q!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png" width="1456" height="971" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:971,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:253298,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/220017231?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!5h7q!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png 424w, https://substackcdn.com/image/fetch/$s_!5h7q!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png 848w, https://substackcdn.com/image/fetch/$s_!5h7q!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png 1272w, https://substackcdn.com/image/fetch/$s_!5h7q!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0782c24a-7be5-462d-ab3a-87e3db586896_2400x1600.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><p></p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-5" href="#footnote-anchor-5" class="footnote-number" contenteditable="false" target="_self">5</a><div class="footnote-content"><p>Georgia Power adjusted the figures in filings that followed, as if seeking to improve the forecasts' accuracy as the due date approached. It walked the 2026 figure back to 3,342 in August 2024; then up (4,002 MW) in November 2024; then down (3,681) in February 2025; then way up (4,445) in May 2025. By two months ago, the figure was down to 1,543 MW. You'd think that, more than halfway through the year, they'd have dialed things in. (They haven't.) As noted, the entirety of Georgia Power's commercial sector is using 492 MW more, on average, than in the same January to July period in 2024.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!jHSp!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!jHSp!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png 424w, https://substackcdn.com/image/fetch/$s_!jHSp!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png 848w, https://substackcdn.com/image/fetch/$s_!jHSp!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!jHSp!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!jHSp!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png" width="1456" height="1456" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1456,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:313153,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/220017231?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!jHSp!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png 424w, https://substackcdn.com/image/fetch/$s_!jHSp!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png 848w, https://substackcdn.com/image/fetch/$s_!jHSp!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!jHSp!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F52e73134-31e0-4706-b354-63f1492e84a3_2400x2400.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><p></p></div></div>]]></content:encoded></item><item><title><![CDATA[Where’s the AI power boom?]]></title><description><![CDATA[Colossus 2 was drawing about half its advertised power in June &#8212; and it wasn't alone. The problem? AI chip economics only work if they&#8217;re running, and utilities are building full-sized power plants.]]></description><link>https://www.isambrooks.com/p/wheres-the-ai-power-boom</link><guid isPermaLink="false">https://www.isambrooks.com/p/wheres-the-ai-power-boom</guid><dc:creator><![CDATA[SAM BROOKS]]></dc:creator><pubDate>Fri, 09 Oct 2026 20:50:16 GMT</pubDate><enclosure url="https://substack-post-media.s3.amazonaws.com/public/images/e005bd17-f530-4a83-b1f2-022fb62520ac_2000x1000.jpeg" length="0" type="image/jpeg"/><content:encoded><![CDATA[<p>Rows of power-generating turbines sit on a lot in Southaven, Mississippi, fed by a natural gas pipeline. The turbines burn the gas to generate electricity, which runs through wires a mile north to a cluster of buildings straddling the Tennessee line. Inside those buildings, more than half a million computer chips &#8212; powered by nothing but those turbines &#8212; form one of the world&#8217;s most famous data centers.</p><p>&#8220;Colossus 2 now operational. First Gigawatt training cluster in the world. Upgrades to 1.5GW in April,&#8221; <a href="https://x.com/elonmusk/status/2012500968571637891">Elon Musk posted</a> in January. </p><div class="callout-block" data-callout="true"><p>Two sets of records &#8212; xAI&#8217;s own turbine data and the gas pipeline&#8217;s daily reports &#8212; say the same thing: Colossus 2&#8217;s chips were drawing about 0.55 gigawatts in June. I&#8217;ve written up the evidence and math in<em> Half a Colossus, </em>below<em>.</em></p></div><p>Until the last couple years, almost no one ever said &#8220;gigawatt,&#8221; or wrote the letters that abbreviate it, GW. If you&#8217;ve never used the word yourself, clearly you&#8217;re doing something right with your life. But even among those who use it a lot, it doesn&#8217;t always have the same meaning, which is a key part of the problem here.</p><p>In the utility world, a watt is a basic unit that measures how much electricity is used, instantaneously, to power something. Phone charger: about 20 watts; hair dryer: 1,500; central AC: 5,000; Colossus 2 data center, on paper: 1,000,000,000. To deal with the zeroes, people often use kilowatt (thousand watts), or megawatt (million watts), or now, increasingly, gigawatt (billion watts). </p><p>In the data center world, one GW is a cluster of computer chips that &#8212; if they&#8217;re all running flat-out &#8212; draw 1,000,000,000 watts. The important word in that sentence: <em>if</em>.</p><div class="callout-block" data-callout="true"><p>From here, I promise it gets more interesting if you care about any of these things:</p><ul><li><p><strong>AI&#8217;s bubble.</strong> At the heart of AI economics are its expensive computer chips &#8212; and the math only works if they&#8217;re running.</p></li><li><p><strong>AI&#8217;s data centers are half-dark. </strong><a href="https://www.wheresyoured.at">Ed Zitron has done extraordinary work</a> to expose how chips aren&#8217;t getting deployed to data centers, in the first place. Now it looks like the chips that do aren&#8217;t being fully utilized.</p></li><li><p><strong>Electric utilities are building for fully lit data centers. </strong>They&#8217;re building power plants and wires &#8212; hundreds of billions of dollars under construction or advanced planning &#8212; for capacity that likely won&#8217;t be used.</p></li></ul></div><div><hr></div><h3>Half a Colossus</h3><p>Colossus 2&#8217;s computer chips used about 0.55 gigawatt (GW) of power in June, or about half the 1.1 gigawatt implied by xAI&#8217;s parent, SpaceX, in a quarterly earnings report submitted to the Securities and Exchange Commission (SEC) in August.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-1" href="#footnote-1" target="_self">1</a></p><p>0.55 GW isn&#8217;t a guess. It&#8217;s the result of triangulating (a lot of) data. </p><p>(NB I&#8217;ve written another <s>thousand</s> 1,353 words about this data &#8212; and the assumptions I&#8217;ve made and the math I&#8217;ve done &#8212; in Footnote 1. I feared death-by-boredom for readers uninterested in the nuances of natural gas procurement, chip cooling, and turbine manufacturing. The short version follows below.)</p><p>Colossus 2&#8217;s electricity consumption is easy to follow, in a way, because those turbine in Mississippi are the only thing generating it. <a href="https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm">SpaceX describes them</a> as &#8220;the mobile gas turbines powering the COLOSSUS II data center,&#8221; and <a href="https://www.mlgw.com/images/content/files/pdf/XAIJuly2025Statement.pdf">the Memphis utility has said</a> it isn&#8217;t supplying the supercomputer. </p><p>To figure out how much power Colossus 2 used in June, then, you just need to figure out how much power those turbines generated in June. It&#8217;s the same number.</p><p>The first way to figure out how much power those turbines generated is to figure out how much natural gas fed them. This is knowable: <a href="https://www.ecfr.gov/current/title-18/chapter-I/subchapter-I/part-284/subpart-A/section-284.13">federal rules require</a> gas pipelines to publish figures, daily, that detail how much gas is delivered to each major delivery point. On June 30, 2026 &#8212; the last day of the quarter for which <a href="https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm">SpaceX told the SEC</a> it had 1.4 GW of IT capacity (which, because Colossus 1 has about 300 MW, implies 1.1 GW at Colossus 2) &#8212; <a href="https://www.gasquest.com/informational-posting">Texas Gas Transmission delivered 184,800</a> MMBtu to the xAI site.</p><p>Turning 184,800 MMBtu of gas into gigawatts of electricity takes one number: the turbines&#8217; burn rate, which describes how much gas the turbines burn to make power. If you google &#8220;heat rate combustion turbine EIA,&#8221; you can find <a href="https://www.eia.gov/electricity/annual/html/epa_08_02.html">the Energy Information Administration&#8217;s table</a>, where the average U.S. gas turbine burns 10,975 Btu per (kilowatt) hour at full power. From there, it&#8217;s math:</p><div class="callout-block" data-callout="true"><p>184,800 MMBtu of gas per day  * 1,000,000 (Btu per MMBtu) = 184.8B Btu per day<br>/ 10,975 Btu per kilowatt-hour<br>= 16.838 million kilowatt-hours per day<br>/ 24 hours = 701,595 kilowatts / 1,000,000 (kW per GW)<br>= 0.702 GW of power (avg.)<br>/ 1.2 (assumed PUE to account for non-chip (mostly cooling) facility power use)<br>= 0.585 GW of IT power</p></div><p>If the gas were all I had, I&#8217;d probably have published the 0.585 GW estimate here, but I&#8217;d have hedged, mostly because my heat-rate assumption could be slightly off. But still. It isn&#8217;t a listing of all the turbines on site, with how many hours each one ran, but the gas consumption data is a <em>very</em> good way to estimate power generation. </p><p>But then.</p><p>Rachel Hurley, who does outstanding investigative work at <a href="https://rachelandthecity.com">Rachel in the City</a>, much of it about environmental and social impacts of xAI, <a href="https://rachelandthecity.com/what-you-should-know-about-mississippis-upcoming-hearing-on-xais-turbines/">published a story</a> that included a bunch of documents she&#8217;d obtained. One was <a href="https://rachelandthecity.com/the-xai-files/records/upcoming-hearing/mzx-runtime-table-2026-07-10.pdf">an email to Mississippi&#8217;s air regulators</a> about xAI&#8217;s turbines. She didn&#8217;t use it the way I&#8217;m about to, but this is basically the ballgame. </p><p>The email contains a listing of all sixty turbines on site &#8212; with the exact hourly runtime, for each turbine, for the month of June. </p><p>From there, it&#8217;s simple math to estimate how much power was generated: each turbine&#8217;s output, times the hours it ran, added up. No Excel required; I did it on my Soulver app. </p><div class="callout-block" data-callout="true"><p>60 turbines (1,445 MW in all): each one&#8217;s megawatts, times the hours it ran in June<br>= 477,494 megawatt-hours of electricity for the month<br>/ 720 hours in June = 663,000 kilowatts<br>= 0.663 GW of power (avg.)<br>/ 1.2 (assumed PUE to account for non-chip (mostly cooling) facility power use)<br>= 0.553 GW of IT power</p></div><p>This is how much power Colossus 2 used in June: roughly 0.66 GW at the facility level, which means the chips used roughly 0.55 GW.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-2" href="#footnote-2" target="_self">2</a> In other words, Colossus 2&#8217;s chips were using about half a gigawatt of power in June, or about half the power the headlines would have you believe.</p><div><hr></div><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/p/wheres-the-ai-power-boom?utm_source=substack&utm_medium=email&utm_content=share&action=share&quot;,&quot;text&quot;:&quot;Share&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/p/wheres-the-ai-power-boom?utm_source=substack&utm_medium=email&utm_content=share&action=share"><span>Share</span></a></p><p>A useful exercise: flip the script. Imagine that we knew nothing about the onsite power capacity, and only had building sensors showing Colossus 2&#8217;s chips averaged 0.55 GW in June. That would raise questions, naturally, about why Colossus 2 wasn&#8217;t better utilizing its chips. </p><p>I can virtually guarantee you what the AI boosters would say:</p><p><em>They probably just didn&#8217;t have enough power supply! Government regulations! They&#8217;re electricity constrained! Supply chain! They&#8217;d use infinite power if it was available!</em></p><p><a href="https://singjupost.com/transcript-elon-musk-remarks-at-g20-innovation-summit/">Musk recently told the G20</a> there will be a &#8220;shortfall of power in 2027 for AI chips,&#8221; a shortfall he measured in gigawatts. Microsoft&#8217;s Satya Nadella said last fall that &#8220;the biggest issue we are now having is not a compute glut, but it&#8217;s power &#8230; you may actually have a bunch of chips sitting in inventory that I can&#8217;t plug in.&#8221; BlackRock&#8217;s <a href="https://transcripts.cnn.com/show/fzgps/date/2026-07-05/segment/01">Larry Fink spent an entire CNN interview</a> lamenting the shortage of electricity for AI, summing it up: &#8220;we don&#8217;t have enough power in the United States.&#8221;<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-3" href="#footnote-3" target="_self">3</a></p><p>This idea falls apart at Colossus 2. In June, xAI&#8217;s turbines were capable of generating up to 1.45 gigawatts of power &#8212; and they produced 0.66, about 0.55 of which went to chips. If anything, it seems they had <em>too much</em> power generation onsite, far more than they needed: eight of xAI&#8217;s turbines didn&#8217;t run a single hour. </p><p>Two final words to get in front of the inevitable comments from AI boosters, which I expect to basically say: <em>you clearly don&#8217;t know about AI computer chips, Sam; obviously a data center can&#8217;t run at 100% utilization.</em> </p><ul><li><p><strong>Training</strong>, not inference. I know this campus is used to train AI models because SpaceX says so &#8212; <a href="https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm">its S-1 describes</a> Colossus 2 as &#8220;currently powering training for our next frontier models&#8221; &#8212; and when chips are training, as Nvidia&#8217;s written, they&#8217;re <a href="https://arxiv.org/abs/2508.14318">basically running flat-out</a>. 100%? Of course not, but it&#8217;s supposed to be way higher than 50%. <a href="https://arxiv.org/abs/2407.21783">Meta says its biggest training run</a> kept the chips working more than 90% of the time; <a href="https://arxiv.org/abs/2312.11805">Google says</a> 97%.</p></li><li><p><strong>Economics</strong>. Presumably the data centers are, at some point, trying to make money? We know the cost-side here: <a href="https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm">Anthropic</a> and <a href="https://www.sec.gov/Archives/edgar/data/1181412/000162828026041150/spacexagreementfwp.htm">Google</a> are paying annual run rates (couldn&#8217;t resist) of <em>$30 billion and $50 billion</em> <em>per gigawatt</em> at Colossus; they pay the same no matter how much they use the chips. In order to have any chance of recouping any of that investment, they better start using those chips to generate tokens and make money.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-4" href="#footnote-4" target="_self">4</a> </p></li></ul><p>Colossus 2 was running at about 50% in June.</p><div class="subscription-widget-wrap-editor" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/subscribe?&quot;,&quot;text&quot;:&quot;Subscribe&quot;,&quot;language&quot;:&quot;en&quot;}" data-component-name="SubscribeWidgetToDOM"><div class="subscription-widget show-subscribe"><div class="preamble"><p class="cta-caption"></p></div><form class="subscription-widget-subscribe"><input type="email" class="email-input" name="email" placeholder="Type your email&#8230;" tabindex="-1"><input type="submit" class="button primary" value="Subscribe"><div class="fake-input-wrapper"><div class="fake-input"></div><div class="fake-button"></div></div></form></div></div><div><hr></div><h3>Data Center Alley</h3><p><a href="https://www.loudoun.gov/6408/Data-Centers-The-Loudoun-Story">Loudoun County, Virginia</a> uses that nickname less frequently these days, but it&#8217;s home to over two hundred data centers. The highest data center concentration on earth, with a big share (maybe 70% (<a href="https://www.washingtonpost.com/business/interactive/2024/data-centers-internet-power-source-coal/">WaPo</a>), or less than 9% (<a href="https://resources.telegeography.com/does-70-of-the-worlds-internet-traffic-flow-through-virginia">real analysis</a>), but whatever, something big!) of the entire internet running through them. </p><p>If the AI boom is a power boom anywhere, it&#8217;s here.</p><p>Virginia&#8217;s also the best place to get a sense for all these gigawatts, because the utility that powers the data centers, <a href="https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5ai---dominion_energy.pdf">Dominion, reports their electricity consumption directly</a>. Whereas other utilities include them in broader sectors (e.g., &#8220;commercial&#8221; or &#8220;industrial&#8221;), Dominion has broken them out for years.</p><p><a href="https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5ai---dominion_energy.pdf">New power demand</a> from data centers added last year: 0.6 GW. That&#8217;s up from 0.45 in 2024, and 0.4 in 2023. </p><p>That&#8217;s a zero, then a decimal point, then a number. It&#8217;s another way of writing, &#8220;less than a gigawatt.&#8221; Here in Data Center Alley, it&#8217;d probably make more sense to communicate data center demand in megawatts, or kilowatts.  </p><p>Dominion speaks in gigawatts when it&#8217;s talking to Wall Street. <a href="https://s2.q4cdn.com/510812146/files/doc_financials/2026/q2/2026-07-31-DE-IR-2Q-2026-earnings-call-slides-vTCII.pdf">In its July 31 presentation</a> to investors, the data slide used &#8220;GW&#8221; seventeen times. The GW in the center of the slide was associated with 53.8, which Dominion said was the total &#8220;data center contracted capacity,&#8221; up from 16.5 in 2023. (<a href="https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5ai---dominion_energy.pdf">Actual electricity demand from all Dominion data centers in 2023: 3.2</a>.) The closest the slide gets to the real world is 12.0, which is the gigawatts with a signed &#8220;Electric Service Agreement (ESA),&#8221; the contract to actually use the power. Nowhere on this slide, or in the 24 pages around it, will you find how much electricity the data centers actually used. </p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!SMqE!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!SMqE!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png 424w, https://substackcdn.com/image/fetch/$s_!SMqE!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png 848w, https://substackcdn.com/image/fetch/$s_!SMqE!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png 1272w, https://substackcdn.com/image/fetch/$s_!SMqE!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!SMqE!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png" width="1456" height="822" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/bbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:822,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:1190365,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/219412300?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!SMqE!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png 424w, https://substackcdn.com/image/fetch/$s_!SMqE!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png 848w, https://substackcdn.com/image/fetch/$s_!SMqE!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png 1272w, https://substackcdn.com/image/fetch/$s_!SMqE!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbd543ea-20bd-41de-8907-0f491d21b728_2302x1300.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Not pictured: actual power demand. During this chart&#8217;s three-year window, Dominion&#8217;s data centers added 1.6 GW of used, real-world, billed demand.</figcaption></figure></div><p>To restate a few of Dominion&#8217;s key numbers here:</p><ul><li><p><a href="https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5ai---dominion_energy.pdf">0.6 GW</a>: new data center power demand added last year</p></li><li><p><a href="https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5ai---dominion_energy.pdf">4.8 GW</a>: total data center power demand today</p></li><li><p><a href="https://s2.q4cdn.com/510812146/files/doc_financials/2026/q2/2026-07-31-DE-IR-2Q-2026-earnings-call-slides-vTCII.pdf">12.0 GW</a>: power demand those data centers have signed contracts to buy</p></li></ul><p>To get to Dominion&#8217;s headline 53.8, you might need your calculator app: from 4.8 (current actual demand), add 7.2, the number that&#8217;s under contract but not showing up; add 9.4 for data centers that&#8217;ve signed a &#8220;Construction Letter of Authorization,&#8221; which triggers construction for new electrical infrastructure; and finally, add 32.4 for data centers that&#8217;ve signed a &#8220;Substation Engineering Letter of Authorization.&#8221;</p><p>It would take more than eighty years, into the 22nd century, to reach 53.8 GW of actual data center electricity demand at the meter&#8217;s current pace.</p><div><hr></div><h3>Amazon in Mississippi</h3><p>For some utilities, one tech company&#8217;s plans can be a big deal, and there&#8217;s no bigger example of this than Mississippi. </p><p>In 2023, Entergy Mississippi&#8217;s industrial customers, which include every factory and mill and car plant in its territory, <a href="https://www.eia.gov/electricity/data/eia861m/">drew a total of 0.27 GW</a>. Then Amazon came to town, and then everything changed. </p><p>The first signal was <a href="https://cdn.misoenergy.org/20231005%20STSTF%20Item%2002%20Mississippi%20Load%20Addition%20EPR630435.pdf">Entergy&#8217;s filing</a> with the grid operator in October 2023, when it said it planned to deliver 1.034 GW to a new customer. In January 2024, the Governor called a special session, where the <a href="https://law.justia.com/codes/mississippi/title-77/chapter-3/article-4/section-77-3-271/">legislature passed a bill</a> to clear the path for two Amazon data center campuses, including letting Entergy build the power plants, and sign Amazon&#8217;s contract, without the state utility regulator&#8217;s approval. The state, Amazon, and the utility have been sprinting forward ever since.</p><p>Entergy&#8217;s plan: 2.26 GW of new power plants, plus the substations and wires to serve Amazon. The utility <a href="https://www.sec.gov/Archives/edgar/data/66901/000006598425000046/R10.htm">started charging its customers</a> for Amazon&#8217;s new infrastructure by July 2024; <a href="https://www.entergy.com/news/entergy-mississippi-breaks-ground-on-delta-blues-advanced-power-station">broke ground on the first plant</a> that November and <a href="https://www.wlbt.com/2025/10/22/leaders-attend-new-vicksburg-advanced-power-station-groundbreaking-ceremony">the second last October</a>; and is currently finalizing permitting <a href="https://www.entergymississippi.com/generation/traceview">for the third plant</a>, which will sit about a mile from one of the data centers. When the data centers came online last summer, <a href="https://www.eia.gov/electricity/data/eia861m/">Entergy Mississippi&#8217;s industrial sales took off</a>. Up 11% year-over-year in August 2025; 44% by December; 92% by February. Though demand hasn&#8217;t moved much since then, the new plateau is an obvious step-change from before.</p><p>But, wait. That&#8217;s big on a percentage basis. What about on a gigawatt basis?</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!Gt-2!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!Gt-2!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png 424w, https://substackcdn.com/image/fetch/$s_!Gt-2!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png 848w, https://substackcdn.com/image/fetch/$s_!Gt-2!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!Gt-2!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!Gt-2!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png" width="1456" height="1456" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/d7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1456,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:257540,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/219412300?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!Gt-2!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png 424w, https://substackcdn.com/image/fetch/$s_!Gt-2!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png 848w, https://substackcdn.com/image/fetch/$s_!Gt-2!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png 1272w, https://substackcdn.com/image/fetch/$s_!Gt-2!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd7c9066f-1511-47dc-b17e-bccb7342604f_2400x2400.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">No more than an eye test needed to see what&#8217;s happening</figcaption></figure></div><p>0.25 GW. <a href="https://www.eia.gov/electricity/data/eia861m/">That was the year-over-year figure in July</a>, roughly where the increase has held since May. <a href="https://epoch.ai/data/data-centers">Epoch AI</a>, which uses satellite imagery and other sources to estimate how many chips are running where, says that as of May, Amazon&#8217;s two campuses in Madison County had nine buildings operating with enough chips inside to draw (cooling included) 0.6 GW. The meter shows 0.25 GW.</p><p>Like Dominion, the figures are more clearly described in megawatts, but Entergy Mississippi is charging ahead with plans measured in gigawatts. All told, their package of new power plants and transmission adds up to about $3.8 billion, a number that&#8217;ll easily climb to $4 billion, maybe $5 billion, after inevitable budget overruns. Everything Entergy Mississippi owned &#8212; every plant, pole and wire, for all of its existing customers &#8212; <a href="https://s201.q4cdn.com/714390239/files/doc_financials/2023/ar/V2/entergy-2023-statistical-report-and-investor-guide.pdf">was valued on its books at $5.1 billion</a> at the end of 2023, the last year before Amazon came to town.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-5" href="#footnote-5" target="_self">5</a></p><div><hr></div><h3>Light, Everywhere</h3><p>Some other examples where data centers are coming onto the grid lighter than expected.</p><div class="image-gallery-embed" data-attrs="{&quot;gallery&quot;:{&quot;images&quot;:[{&quot;type&quot;:&quot;image/png&quot;,&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/6e76b399-09f3-47c9-87b6-b1e1b3289e2d_2400x2400.png&quot;},{&quot;type&quot;:&quot;image/png&quot;,&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/b8708a3e-a051-41a0-a32a-c3ad52939008_2400x2400.png&quot;},{&quot;type&quot;:&quot;image/png&quot;,&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/6a8763b2-00a0-412b-81cd-b98fde053995_2400x2400.png&quot;}],&quot;caption&quot;:&quot;Same test, three campuses: the meter shows 41, 24 and 56 percent of what they could draw.&quot;,&quot;alt&quot;:&quot;&quot;,&quot;staticGalleryImage&quot;:{&quot;type&quot;:&quot;image/png&quot;,&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/f4744544-2051-4e7b-8f78-6f53f4c0a63d_1456x474.png&quot;}},&quot;isEditorNode&quot;:true}"></div><p><strong>Microsoft&#8217;s Fairwater (Mount Pleasant, Wisconsin).</strong> <a href="https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/">Microsoft calls it</a> &#8220;the world&#8217;s most powerful AI datacenter.&#8221; The campus that <a href="https://www.microsoft.com/en-us/investor/events/fy-2026/earnings-fy-2026-q1">Satya Nadella told Wall Street</a> would &#8220;scale to two gigawatts alone&#8221; went live in April, <a href="https://x.com/satyanadella/status/2044767391293509761">Nadella said</a>, &#8220;ahead of schedule,&#8221; with &#8220;hundreds of thousands of GB200s&#8221; in &#8220;a single seamless cluster.&#8221; Using satellite data, <a href="https://epoch.ai/data/data-centers">Epoch estimated</a> the site was online with chips that&#8217;d draw approximately 0.44 GW of total power, facility cooling included. By July, <a href="https://www.eia.gov/electricity/data/eia861m/">the local utility reported</a> industrial power demand was up year-over-year: 0.18 GW.  Assuming every watt of that new demand came from Microsoft, sixty percent of the world&#8217;s most powerful AI datacenter is sitting idle.</p><p><strong>Applied Digital&#8217;s data center built for CoreWeave (Ellendale, North Dakota).</strong> The utility&#8217;s numbers here are small, but the small numbers make it easy to see movement at the meter. <a href="https://ir.applieddigital.com/news-events/press-releases/detail/137/applied-digital-completes-phase-ii-ready-for-service-at">Applied Digital told investors</a> in November that its first building &#8220;now operates at its full 100 MW critical IT load,&#8221; which would equate to 0.12 GW of total facility demand on the grid. <a href="https://www.eia.gov/electricity/data/eia861m/">The local utility&#8217;s meter</a> didn&#8217;t move until February, but since then the jump&#8217;s been obvious: 0.03 GW more than the year before. In other words: a quarter of what the company said was running.</p><p><strong>Amazon&#8217;s Project Rainier (New Carlisle, Indiana). </strong>This is one of the sites <a href="https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster">where Anthropic trains its models</a>. When Amazon walked <a href="https://www.nytimes.com/2025/06/24/technology/amazon-ai-data-centers.html">the New York Times</a> through the campus last summer, the number was 2.2 gigawatts, though <a href="https://epoch.ai/data/data-centers">Epoch&#8217;s satellite-based estimate</a> indicates that the operational chips could draw (including cooling) 1.1 GW.   <a href="https://www.eia.gov/electricity/data/eia861m/">Indiana Michigan Power&#8217;s commercial demand</a> in Indiana is up about 0.6 GW from July 2024, the last July before the campus switched on. If we assume every single watt of growth is coming from Amazon, the chips Anthropic trains on are running at about half of their total theoretical power. </p><div><hr></div><h3>They Know What&#8217;s Going On</h3><p>Data about data centers &#8212; and how much power they&#8217;re using &#8212; is obviously available to the electric utilities delivering that power. Once in a while, they look at it.</p><p>One of Australia&#8217;s grid operators has been especially upfront about what&#8217;s going on. <a href="https://aemo.com.au/-/media/files/electricity/nem/planning_and_forecasting/nem_esoo/2026/2026-electricity-statement-of-opportunities.pdf">The Australian Energy Market Operator counted</a> the data centers on its grid and found that the ones running were drawing power at 27% of the grid capacity they&#8217;d signed up for.<strong><sup> </sup></strong>The Australian report also gets into the one thing that makes this complicated: whether the chips are training AI models, or serving them. The conventional wisdom is that while training runs chips flat out, serving chatbots doesn&#8217;t, because there&#8217;s more demand at 3pm than 3am. But Australia found something interesting: all together, including inference, the data centers are actually running at about 90% of their own peak, which roughly mirrors estimates from at least two US-based utilities. This suggests the tech companies have figured out how to utilize their chips so that the swings in chatbot demand don&#8217;t significantly swing power demand, which means that even if used for inference, a data center that peaks at a gigawatt should be expected to use, on average, about 0.9 gigawatts of power.</p><p>Some American utilities have let the truth out, too. In Omaha, <a href="https://www.oppd.com/media/321227/2026-corporate-operating-plan.pdf">the public utility&#8217;s 2026 operating plan</a> includes its consultant&#8217;s finding that big customers hand in growth schedules that &#8220;have typically outpaced actual customer meter reads.&#8221; <a href="https://www.fool.com/earnings/call-transcripts/2026/02/10/duke-energy-duk-q4-2025-earnings-call-transcript/">Duke&#8217;s CFO told investors</a> the company now risk-adjusts its forecasted sales &#8220;basically to the minimum billing demands.&#8221; </p><p>More often, the utilities fight the data. In Texas, <a href="https://interchange.puc.texas.gov/Documents/58480_29_1549197.PDF">AEP Texas</a> and <a href="https://interchange.puc.texas.gov/Documents/58480_26_1549165.PDF">Oncor</a> asked regulators to strip the grid operator of the power <a href="https://interchange.puc.texas.gov/Documents/58480_29_1549197.PDF">to adjust utility forecasts</a> using &#8220;historical realization rates&#8221; (i.e., what actually showed up). In Indiana, <a href="https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/8c516c87-fa8c-f011-b4cc-001dd8084fd9/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=Joint%20Reply%20to%20CAC%27s%20Response%20to%20the%20Public%20Report%20Format-9-8-25.pdf">Amazon, Google and the Data Center Coalition</a> opposed publishing actual numbers, instead of broad ranges, on big customers&#8217; electricity use.</p><p>And sometimes, the people who work for the regulators say it out loud. Georgia&#8217;s utility regulators <a href="https://psc.ga.gov/search/facts-document/?documentId=222553">were warned, by their own staff</a>, that the data centers were coming in light. In May 2025, the staff checked the three operating data centers against what they had announced for 2024: 37% of their planned load actually showed at the meter. </p><p>Last November, <a href="https://psc.ga.gov/search/facts-document/?documentId=224483">the staff said</a> Georgia Power&#8217;s forecast for its big new customers was running 84% above what they actually drew. The operating projects were using much less than forecast, and they specifically pointed out the lighter-than-expected demand &#8220;does not represent a delay in the in-service date, but specifically a lower level of load materialization.&#8221; As for the future pipeline: &#8220;Only about 1,900 MW is supported by such contracts. The rest is speculative.&#8221;</p><div><hr></div><h3>Georgia: F It, We&#8217;re Building Anyway</h3><p>In February, the CEO of Georgia Power&#8217;s parent, Southern Company&#8217;s <a href="https://news.alphastreet.com/the-southern-company-so-q4-2025-earnings-call-transcript/">Chris Womack, called demand</a> growth &#8220;arguably unprecedented,&#8221; and <a href="https://www.fool.com/earnings/call-transcripts/2026/08/03/southern-company-so-q2-2026-earnings-call-transcript/">the company told investors</a> all year that its pipeline of big customers, mostly data centers, stands at over 75 GW.</p><p>Back on planet earth, in July, Georgia Power&#8217;s commercial customers (<a href="https://www.eia.gov/electricity/data/eia861m/">where it logs data centers</a>) used 5.1 GW, up from 4.8 GW last July. A 0.3 GW move isn&#8217;t nothing &#8212; and the best explanation is Microsoft&#8217;s other Fairwater campus, outside Atlanta, <a href="https://www.isambrooks.com/p/why-isnt-microsoft-using-georgias">which I&#8217;ve now written about at length</a> &#8212; but also, it&#8217;s kind of nothing. Georgia Power tells Wall Street its <a href="https://news.alphastreet.com/the-southern-company-so-q4-2025-earnings-call-transcript/">sales will grow about 13%</a> a year through 2030. Last year, total sales grew just 2.4%.</p><p>Georgia Power&#8217;s own paperwork admits the data centers are coming in light, in its way. <a href="https://psc.ga.gov/search/facts-document/?documentId=227753">It files a &#8220;pipeline report&#8221;</a> every quarter, and the June one reads like the last several: 6.8 GW of new projects joined the line, while the projects already in it pushed 2.2 GW of the load they&#8217;d promised for 2028 into later years. Of the ten projects that changed their start dates, eight of them moved back. The report&#8217;s own explanation for why its near-term number fell while its total rose: &#8220;changes in projected near-term load ramps.&#8221; Even OpenAI&#8217;s campus &#8212; 3.2 GW, the biggest deal in the state &#8212; slid a year, from full power in 2031 to 2032, between the March and June reports. The near term keeps shrinking, while the far term keeps growing. The hockey stick is always next year.</p><p>Georgia Power is building anyway, its own meters and its regulator&#8217;s staff be damned. <a href="https://psc.ga.gov/search/facts-document/?documentId=224953">It won approval</a> last December from elected regulators for 10 GW of new power &#8212; <a href="https://www.sec.gov/Archives/edgar/data/92122/000009212225000098/so-20251209.htm">including $16 billion</a> of company-owned, profit-generating assets &#8212; but they&#8217;re already planning for more. <a href="https://www.fool.com/earnings/call-transcripts/2026/08/03/southern-company-so-q2-2026-earnings-call-transcript/">On July&#8217;s call</a> with Wall Street, Womack said the OpenAI deal &#8220;pushes us &#8230; right around 1 gigawatt&#8221; past what regulators approved in December.</p><p>Up 0.3 gigawatts in the last year, and another 75 gigawatts on the way. </p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/p/wheres-the-ai-power-boom?utm_source=substack&utm_medium=email&utm_content=share&action=share&quot;,&quot;text&quot;:&quot;Share&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/p/wheres-the-ai-power-boom?utm_source=substack&utm_medium=email&utm_content=share&action=share"><span>Share</span></a></p><div><hr></div><div class="subscription-widget-wrap-editor" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/subscribe?&quot;,&quot;text&quot;:&quot;Subscribe&quot;,&quot;language&quot;:&quot;en&quot;}" data-component-name="SubscribeWidgetToDOM"><div class="subscription-widget show-subscribe"><div class="preamble"><p class="cta-caption"></p></div><form class="subscription-widget-subscribe"><input type="email" class="email-input" name="email" placeholder="Type your email&#8230;" tabindex="-1"><input type="submit" class="button primary" value="Subscribe"><div class="fake-input-wrapper"><div class="fake-input"></div><div class="fake-button"></div></div></form></div></div><p></p><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-1" href="#footnote-anchor-1" class="footnote-number" contenteditable="false" target="_self">1</a><div class="footnote-content"><p><strong>The long story:</strong></p><p><strong>SpaceX&#8217;s compute claim.</strong> SpaceX&#8217;s <a href="https://www.sec.gov/edgar/browse/?CIK=1181412">Q2 SEC report</a> says: &#8220;We calculate nameplate compute draw for a period as the number of GPUs installed in our data centers at the end of the period multiplied by their respective all-in power draw. Nameplate compute draw reflects installed capacity and does not represent actual power consumption or utilization.&#8221; As of June 30, 2026: 1.4 GW.</p><p>The SEC filing doesn&#8217;t break that down by site, but <a href="https://x.com/elonmusk/status/2103329761690865846">Musk did</a>: &#8220;Colossus 1 is 150k H100, 50k H200 and 30k GB200. Colossus 2 is 110k GB200 and 440k GB300.&#8221; At about 1.3 kilowatts per H100 or H200 (Nvidia rates its eight-GPU H100 system at <a href="https://docs.nvidia.com/dgx/dgxh100-user-guide/introduction-to-dgxh100.html">10.2 kW max</a>, and SpaceX&#8217;s own prospectus puts its first &#8220;approximately 100,000 H100 processors&#8221; at &#8220;approximately 130 megawatts&#8221;), and about 1.9 per GB200 and 2.0 per GB300 (Nvidia puts a 72-GPU GB200 rack at <a href="https://docs.nvidia.com/dgx/dgxgb200-user-guide/hardware.html">&#8220;approximately 120kW,&#8221;</a> about 1.7 per GPU, before the networking and storage an &#8220;all-in&#8221; number includes), Musk&#8217;s chips come to 0.32 GW at Colossus 1 and 1.09 GW at Colossus 2 &#8212; 1.41 in total, matching the 10-Q&#8217;s 1.4.</p><p><a href="https://x.com/elonmusk/status/2012500968571637891">Musk on January 17, 2026</a>: &#8220;Colossus 2 now operational. First Gigawatt training cluster in the world. Upgrades to 1.5GW in April.&#8221;</p><p><strong>The turbines are Colossus 2&#8217;s only power.</strong> SpaceX&#8217;s 10-Q, describing the NAACP&#8217;s Clean Air Act suit, refers to &#8220;the mobile gas turbines powering the COLOSSUS II data center.&#8221; Memphis&#8217;s utility, MLGW, in a <a href="https://www.mlgw.com/images/content/files/pdf/XAIJuly2025Statement.pdf">July 22, 2025 statement</a>: &#8220;MLGW is not supplying power to their supercomputer, Colossus 2.&#8221;</p><p><strong>The gas.</strong> Federal rules require interstate pipelines to post, every day, how much gas is scheduled at each delivery point (<a href="https://www.ecfr.gov/current/title-18/chapter-I/subchapter-I/part-284/subpart-A/section-284.13">18 CFR 284.13 (d))</a>). Texas Gas Transmission&#8217;s daily &#8220;Operationally Available Capacity&#8221; report detailed delivery to point 26096, &#8220;MZX Southaven.&#8221; Texas Gas&#8217;s own list of its locations names the company at that point, MZX Tech LLC, and MZX Tech is the xAI company that runs the turbines (more below).</p><p>On June 30, 2026, the Total Scheduled Quantity was 177,000 MMBtu. The day before, 175,000; July 1, 176,990. Every day from July 8 through July 17 reads exactly 177,000. (That&#8217;s each day&#8217;s last posted schedule. The day&#8217;s first schedule, &#8220;Timely,&#8221; sometimes opens higher and gets cut back: July 10 opened at 262,818 and finished at 177,000.) The schedule steps up to 180,000 on July 18, 190,000 on July 29, and 195,000 for most of August. </p><p>In addition to the scheduled quantity for each day, subsequent filings provide data about the so-called &#8220;no notice&#8221; deliveries of power. Those figures have been incorporated into the figures used for the estimates above. Specifically, per the &#8220;no notice&#8221; report, the June 30 quantity of 177,000 is adjusted upward by 7,800 to 184,800. </p><p><strong>From gas to power.</strong> Three assumptions, plus math.</p><ol><li><p>The site burned all the gas it scheduled, and June 30 is a fair stand-in for the rest of June. (Earlier June days have aged off the pipeline&#8217;s public listing.) If June averaged less than 177,000 a day, the gas-based number would be lower, too. In reality, given that the figure has trended up during the year, the 177,000 figure likely overstates how much gas was consumed (and thus power generated) on the site during June.</p></li><li><p>Heat rate: how many Btu of gas a turbine burns to make a kilowatt-hour. I used the Energy Information Administration&#8217;s average for gas turbines, 10,999 Btu per kilowatt-hour (<a href="https://www.eia.gov/electricity/annual/html/epa_08_02.html">EIA, Electric Power Annual, Table 8.2</a>). EIA&#8217;s gas-turbine average has been between 10,999 and 11,378 since 2014; anywhere in that band, 177,000 MMBtu a day comes to between 0.54 and 0.56 GW of IT power (at a PUE of 1.2).</p></li><li><p>PUE. Computer chips aren&#8217;t the only thing drawing power in a building: there are other uses of electricity, mostly to cool the chips, which get hot when they run. See the note at the end for more on the possible range of PUEs, which Grok estimated at 1.1 to 1.4 for Colossus 2.</p></li></ol><p><strong>Three questions: Is customer 26096 xAI? </strong>Texas Gas&#8217;s location list names the customer: MZX Tech LLC. MZX Tech LLC is: the permittee on Mississippi&#8217;s air permit for the Stanton Road turbines (<a href="https://www.mdeq.ms.gov/">MDEQ permit 0680-00119</a>); the company in MDEQ&#8217;s July 30, 2026 <a href="https://rachelandthecity.com/the-xai-files/records/upcoming-hearing/mdeq-agreed-order-7739-26-2026-07-30.pdf">order</a> on the turbines at 2875 Stanton Road; X.AI Corp.&#8217;s co-defendant in the Clean Air Act case <a href="https://www.sec.gov/edgar/browse/?CIK=1181412">SpaceX describes</a> in its 10-Q. <strong>Did xAI have another pipe or another account?</strong> Texas Gas lists a second physical point, 26135, &#8220;MZX Southaven #2,&#8221; that hasn&#8217;t posted any volume. <strong>Was xAI regularly burning more gas than it scheduled?</strong> Taking more gas than you schedule throws the pipeline out of balance; pipelines charge penalties for it and can even cut off supply.</p><p><strong>All three questions were answered</strong> by the turbine runtime log, which describes a fleet of gas turbines that use about 177,000 MMBtu a day.</p><p><strong>The turbine runtime log.</strong> On June 17, 2026, the chief of Mississippi&#8217;s Air Division asked xAI&#8217;s environmental consultant, Trinity Consultants, for &#8220;the typical average daily operational time for all units (i.e., 1 through 60).&#8221; On July 10, Trinity sent back a table: Unit, Unit Type, Control, Total Power Output, Date Added, June Hours, June Daily Avg. The PDF is MDEQ&#8217;s copy of the email chain; Rachel Hurley posted it in full with her records for the upcoming hearing (<a href="https://rachelandthecity.com/the-xai-files/records/upcoming-hearing/mzx-runtime-table-2026-07-10.pdf">PDF</a>).</p><p>Sixty units, 1,445 MW: 34 GE TM2500s (20 to 35 MW each, 903 MW), 14 Solar SMT-130s (13 MW each, 182 MW) and 12 Mitsubishi FT8s (30 MW each, 360 MW). With June&#8217;s 720 hours, the turbines could have run 43,200 turbine-hours. They ran 21,439, an average of 357 hours per unit. Fifteen ran 600 hours or more; unit 30 ran all 720; eight ran zero. Each unit&#8217;s megawatts times its hours, summed: 477,494 megawatt-hours. Divided by 720 hours: 663 MW. Divided by 1.2 (PUE): 553 MW of chips.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!ofll!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!ofll!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png 424w, https://substackcdn.com/image/fetch/$s_!ofll!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png 848w, https://substackcdn.com/image/fetch/$s_!ofll!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png 1272w, https://substackcdn.com/image/fetch/$s_!ofll!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!ofll!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png" width="1206" height="2622" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:2622,&quot;width&quot;:1206,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:479387,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/219412300?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!ofll!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png 424w, https://substackcdn.com/image/fetch/$s_!ofll!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png 848w, https://substackcdn.com/image/fetch/$s_!ofll!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png 1272w, https://substackcdn.com/image/fetch/$s_!ofll!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9f78ac88-761e-4ea0-a837-d6b556883500_1206x2622.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Cool-looking visual coming soon to illustrate Colossus 2&#8217;s power generation; for now, enjoy a screenshot of my Soulver calcs for the turbine runtimes</figcaption></figure></div><p>That credits every running turbine with its full listed rating for every hour it ran, which makes it a ceiling: if the running units averaged less than their listed output, the chips drew less. The gas says they ran close to their listed ratings. At 90% of listed output, 177,000 MMBtu a day would mean a heat rate of about 12,400, 12% worse than EIA&#8217;s average.</p><p>The two independent records land within six megawatts of each other: 0.559 GW of chips from the gas at EIA&#8217;s heat rate, 0.553 from the turbine run log.</p><p><strong>Sanity check on the gas math.</strong> TVA&#8217;s Southaven combined-cycle plant takes gas from the same pipeline at the next point over (location 9198): 113,572 MMBtu on June 30. At EIA&#8217;s average for combined-cycle plants, 7,548 Btu per kilowatt-hour (same table), that&#8217;s about 627 MW. TVA rates the plant at <a href="https://lakeinfo.tva.gov/web/sites/southaven.htm">774 MW</a> in summer, so that sounds about right for a hot June day. You can also see here how and why the Colossus turbines create more pollution: a simple-cycle turbine takes about 46% more gas to make a kilowatt-hour than a combined-cycle plant. This is one (good) reason why clean air advocates have criticized the Colossus 2 setup.</p><p><strong>IT load &#8594; facility load conversions. </strong>Throughout this article, I&#8217;ve frequently converted the power draw for computer chips (often referred to as &#8220;IT compute&#8221; or &#8220;IT critical load&#8221;) into a power draw for the entire data center facility. A computer chip generates a lot of heat when it runs, which requires the building to cool the chips, which means the building uses a material amount of (non-chip) power. I&#8217;ve accounted for this with a Power Usage Effectiveness (PUE) assumption of 1.2. </p><p>To sanity-check this assumption (among approximately 394 sanity checks for this piece), I asked Grok to estimate Colossus 2&#8217;s average facility electricity load for June 2026 and to include a specific estimate for PUE. Grok&#8217;s best guess: PUE of 1.25. </p><p>(Note: Using its estimated average IT load of 875 MW, Grok estimated total facility load of roughly 1,050 - 1,250. (Grok sort of screwed up the facility load, below. After estimating the average IT load, in addition to peak IT load, it forgot to account for average-vs-peak when doing the below PUE sensitivity analysis. Anyway, none of these figures is even close to the real one.)</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!S4ZI!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!S4ZI!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png 424w, https://substackcdn.com/image/fetch/$s_!S4ZI!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png 848w, https://substackcdn.com/image/fetch/$s_!S4ZI!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png 1272w, https://substackcdn.com/image/fetch/$s_!S4ZI!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!S4ZI!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png" width="1206" height="600" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:600,&quot;width&quot;:1206,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:68577,&quot;alt&quot;:&quot;&quot;,&quot;title&quot;:&quot;&quot;,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/219412300?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" title="" srcset="https://substackcdn.com/image/fetch/$s_!S4ZI!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png 424w, https://substackcdn.com/image/fetch/$s_!S4ZI!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png 848w, https://substackcdn.com/image/fetch/$s_!S4ZI!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png 1272w, https://substackcdn.com/image/fetch/$s_!S4ZI!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F11b28532-5fa1-4b55-b774-2e069fe45eb7_1206x600.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Grok&#8217;s estimate of Colossus 2 avg power draw in June 2026 (the real figure: 663, 553 of it chips)</figcaption></figure></div></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-2" href="#footnote-anchor-2" class="footnote-number" contenteditable="false" target="_self">2</a><div class="footnote-content"><p>The turbine-derived figure is awfully close to the gas-derived figure&nbsp;(within 6%), which helps reinforce and improve the confidence of the power generation/consumption estimates herein. Among other things, this makes me more confident that my estimate isn&#8217;t missing a large amount of generation. This matters because if I&#8217;d only had the turbine data (and didn&#8217;t have the gas data), I&#8217;d have published this estimate, but I&#8217;d have hedged, because I would&#8217;ve wondered if xAI was not disclosing all of its turbines in the email to regulators. But by triangulating this with the gas data, I&#8217;m confident all of the turbines are accounted for and that this estimate is accurate.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-3" href="#footnote-anchor-3" class="footnote-number" contenteditable="false" target="_self">3</a><div class="footnote-content"><p>Musk's shortfall has been "next year" for three years running. <a href="https://newatlas.com/technology/elon-musk-ai">Berlin, March 2024</a>: "I think next year, you'll see they just can't find enough electricity." <a href="https://www.cnbc.com/2025/05/20/elon-musk-says-ai-could-run-into-power-capacity-issues-by-middle-of-next-year.html">CNBC, May 2025</a>: "maybe by the middle of next year, end of next year." And in his same G20 remarks, his account of how SpaceX got around the shortage: Google and Anthropic are leasing compute from SpaceX "by constructing our own power plants. It's the only way we were able to do it." Those power plants are the sixty turbines in this piece, and in June they ran at 46 percent.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-4" href="#footnote-anchor-4" class="footnote-number" contenteditable="false" target="_self">4</a><div class="footnote-content"><p>In order to get a sense of the AI chip economics, it&#8217;s helpful to compare them to another kind of equipment: turbines that burn gas to generate electricity.</p><p>This is familiar terrain &#8212; because I&#8217;ve spent much of my career all-but yelling at utilities: <em>hey dummies, you&#8217;re wasting tons of money by not better utilizing your power-generating assets!</em> (When utilities buy expensive infrastructure and don&#8217;t use it, it&#8217;s infuriating, because they&#8217;re just passing the cost of the assets through to everyone with a power bill.)</p><p>When it comes to chips, the assets don&#8217;t appear to be utilized well, either. But the differences in scale are staggering, and the scale here makes what the tech companies are doing especially dumb. A comparison of rental rates for both pieces of equipment &#8212; what Anthropic pays SpaceX for its chips (using Anthropic to be conservative; Google&#8217;s figure is two-thirds higher), converted to gigawatts, versus an imputed rental rate for a combustion gas turbine:</p><ul><li><p>$427,000 per gigawatt, per day: cost to rent a gas turbine (<a href="https://www.pjm.com/-/media/DotCom/committees-groups/committees/mic/2026/20260708/20260708-item-07-1---periodic-review-of-default-cone-and-acr-values.pdf">PJM&#8217;s</a> estimate of what a new one costs to build, finance and maintain, 2026/27)</p></li><li><p>$82 million per gigawatt, per day: cost to rent AI compute (Anthropic&#8217;s $1.25 billion a month for about 0.5 GW of chips)</p></li></ul><p>See what&#8217;s happening here? It&#8217;s already dumb enough when expensive gas turbines aren&#8217;t fully utilized &#8212; when utilities buy expensive assets they don&#8217;t fully utilize &#8212; but, if you&#8217;re not fully utilizing AI chips, that is REALLY F&#8217;ING DUMB. </p><p>One more swing here, with a simpler analogy. Imagine you own a restaurant where the kitchen cost $100k, but then in your infinite wisdom you decide to expand with a new kitchen that costs $1 million. <em>You better fully utilize that kitchen. </em></p><p><strong>RE Anthropic and Google&#8217;s annual run rate</strong> (iykyk): SpaceX&#8217;s prospectus says Anthropic is paying $1.25 billion a month for about 325,000 GPUs, or about 0.5 GW at the per-chip figures in Footnote 1. That&#8217;s $15 billion a year for 0.5 GW, or $30 billion per gigawatt. Google pays $920 million a month for 110,000 GPUs (about 0.22 GW): $11 billion a year for 0.22 GW; about $50 billion per gigawatt.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-5" href="#footnote-anchor-5" class="footnote-number" contenteditable="false" target="_self">5</a><div class="footnote-content"><p>RE &#8220;$3.8 billion&#8221;: Entergy&#8217;s three gas plants (it says &#8220;approximately $3.5 billion&#8221;: $1.2 billion, $1.2 billion and &#8220;more than $1 billion&#8221;) plus the three substations in the 2023 filing with the grid operator ($282 million).</p></div></div>]]></content:encoded></item><item><title><![CDATA[The Power Grid “Crisis”]]></title><description><![CDATA[AI isn&#8217;t skyrocketing electricity use, no matter how many times utilities say so]]></description><link>https://www.isambrooks.com/p/the-power-grid-crisis</link><guid isPermaLink="false">https://www.isambrooks.com/p/the-power-grid-crisis</guid><dc:creator><![CDATA[SAM BROOKS]]></dc:creator><pubDate>Mon, 05 Oct 2026 18:16:01 GMT</pubDate><enclosure url="https://substack-post-media.s3.amazonaws.com/public/images/87954564-3272-4e65-974e-08915ee46032_2400x1260.png" length="0" type="image/jpeg"/><content:encoded><![CDATA[<p>The CEO of Exelon, the utility that delivers power in Chicago, Philly, Baltimore, and DC, is sounding the alarm: electricity consumption is skyrocketing &#8212; at a pace unseen in &#8220;<a href="https://www.foxnews.com/tech/artificial-intelligence-helps-fuel-new-energy-sources">decades</a>,&#8221; &#8220;<a href="https://www.cnbc.com/video/2025/11/10/exelon-ceo-calvin-butler-talks-ais-power-demand-and-looming-power-shortages.html">30 to 40 years</a>,&#8221; or maybe <a href="https://www.linkedin.com/posts/calvin-butler-jr_cnbc-power-demand-activity-7394110534054211584-69rQ">ever</a> &#8212; and the grid isn&#8217;t keeping up. Calvin Butler delivers this message in interview after interview, often in an almost somber tone, at the pace of someone choosing his words carefully. </p><p>&#8220;The unprecedented load growth that we&#8217;re experiencing,&#8221; as Butler <a href="https://www.youtube.com/live/XZUU59bEoSs?si=LZPtod_7ZgX6JKIh&amp;t=732">explained recently</a> on the sidelines of the UN General Assembly, has <a href="https://www.youtube.com/live/XZUU59bEoSs?t=778s">consequences</a>. &#8220;Now you have a level of growth that we don&#8217;t have adequate supply to meet.&#8221;</p><p>In Butler&#8217;s telling, real danger lurks on an especially hot or cold day. &#8220;You might have a supply crunch,&#8221; he <a href="https://fortune.com/2025/12/24/exelon-calvin-butler-ai-data-center-energy-warning/">told </a><em><a href="https://fortune.com/2025/12/24/exelon-calvin-butler-ai-data-center-energy-warning/">Fortune</a></em>&#8217;s Brainstorm AI conference, &#8220;and people are going to suffer.&#8221; As he <a href="https://www.ft.com/content/14d2e591-7cd5-4456-904f-1b7fdc5cbc1a">put it to the </a><em><a href="https://www.ft.com/content/14d2e591-7cd5-4456-904f-1b7fdc5cbc1a">Financial Times</a></em>, Americans could &#8220;absolutely&#8221; see blackouts in 2027 if supply doesn&#8217;t catch up.</p><p>Butler&#8217;s warning is stark, but probably sounds familiar: a version of it runs in story after story about data centers. Over the past several years, the media has worked through the thesaurus to describe electricity demand: &#8220;surging&#8221; (<a href="https://www.cbsnews.com/news/how-surging-demand-for-energy-and-rise-of-ai-is-straining-the-power-grid-in-u-s/">CBS</a>, <a href="https://www.nbcnews.com/tech/tech-news/nuclear-power-oklo-sam-altman-ai-energy-rcna139094">NBC</a>, <a href="https://www.nytimes.com/interactive/2024/03/13/climate/electric-power-climate-change.html">New York Times</a>, <a href="https://www.reuters.com/business/energy/vistra-buy-cogentrix-energy-4-billion-deal-2026-01-05/">Reuters</a>); &#8220;soaring&#8221; (<a href="https://www.wsj.com/business/energy-oil/americas-demand-for-power-is-soaringand-so-are-the-costs-of-building-out-the-grid-f57b5adb">Wall Street Journal</a>, <a href="https://fortune.com/2024/03/22/crypto-marijuana-data-center-power-use-electric-grid/">Fortune</a>); &#8220;booming&#8221; (<a href="https://www.bloomberg.com/news/audio/2026-01-15/odd-lots-how-to-profit-from-the-booming-energy-demand-podcast">Bloomberg</a>); &#8220;supercycle&#8221; (<a href="https://www.economist.com/business/2025/01/05/a-new-electricity-supercycle-is-under-way">Economist</a>); &#8220;explosive&#8221; (<a href="https://www.washingtonpost.com/business/2024/03/07/ai-data-centers-power/">Washington Post</a>). </p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!Zx2T!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!Zx2T!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png 424w, https://substackcdn.com/image/fetch/$s_!Zx2T!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png 848w, https://substackcdn.com/image/fetch/$s_!Zx2T!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png 1272w, https://substackcdn.com/image/fetch/$s_!Zx2T!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png 1456w" sizes="100vw"><img src="https://substackcdn.com/image/fetch/$s_!Zx2T!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png" width="1456" height="1107" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1107,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:3241479,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:false,&quot;topImage&quot;:true,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/216027304?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!Zx2T!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png 424w, https://substackcdn.com/image/fetch/$s_!Zx2T!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png 848w, https://substackcdn.com/image/fetch/$s_!Zx2T!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png 1272w, https://substackcdn.com/image/fetch/$s_!Zx2T!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F24727327-2f30-40b2-87c2-d7726c0ad09d_2000x1520.png 1456w" sizes="100vw" fetchpriority="high"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Does anyone in the media bother fact-checking anymore, or nah?</figcaption></figure></div><p>Sometimes the utility skips the middleman. In May, Exelon&#8217;s Philly utility, PECO, ran sponsored <a href="https://www.inquirer.com/philly-first/peco-combat-rising-prices-20260528.html">content in the </a><em><a href="https://www.inquirer.com/philly-first/peco-combat-rising-prices-20260528.html">Philadelphia Inquirer</a></em> about the &#8220;rising costs of keeping the lights on.&#8221; PECO was unequivocal about the cause: &#8220;After about two decades of flat growth in electricity usage, consumption soared nationwide in 2023.&#8221;</p><p>Like so much from Exelon and its CEO, that&#8217;s simply not true.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-1" href="#footnote-1" target="_self">1</a></p><h3>Power demand isn&#8217;t surging</h3><p>Nationwide, electricity use grew 1.2% over the past year (and was down in 2023). Far from &#8220;increasing faster than at any point in the past century,&#8221; <a href="https://www.exeloncorp.com/newsroom/exelon-launches-the-exelon-promise-to-fight-out-of-control-energy-costs">as Exelon&#8217;s website says</a>, demand grew faster in 75 of the last 100 years.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-2" href="#footnote-2" target="_self">2</a> </p><p>For Exelon specifically, in the year ending June 2026, its customers used 196 terawatt-hours (TWh) of electricity. That was all the way up from 195 TWh in the previous year. In 2016, it was 203 TWh; in 2000, it was 197 TWh.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-3" href="#footnote-3" target="_self">3</a></p><p>Exelon is no different from most 21st-century utilities: they&#8217;re boring, mature companies. Electricity sales are sluggish, and have been for a generation, because modern buildings and technologies have found ways to <a href="https://www.aceee.org/news/2019-electricity-sales-continue-decade-long-flat-trend/">use electricity more efficiently</a>.</p><div class="image-gallery-embed" data-attrs="{&quot;gallery&quot;:{&quot;images&quot;:[{&quot;type&quot;:&quot;image/png&quot;,&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/8b34dad3-740e-4632-9f3a-167d3b29f5cb_2000x2000.png&quot;},{&quot;type&quot;:&quot;image/png&quot;,&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/61ce551c-5ace-4728-93c8-b24ebb04d21f_2000x2000.png&quot;},{&quot;type&quot;:&quot;image/png&quot;,&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/0e7bb2a3-2e46-47bd-88f9-07ba1f7b4255_2000x2000.png&quot;},{&quot;type&quot;:&quot;image/png&quot;,&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/8fbd742a-a6e9-46b7-a9aa-2c540dd123da_2000x2000.png&quot;}],&quot;caption&quot;:&quot;Electricity consumption's not soaring &#8212; not for Exelon, and not for the U.S.&quot;,&quot;alt&quot;:&quot;&quot;,&quot;staticGalleryImage&quot;:{&quot;type&quot;:&quot;image/png&quot;,&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/42ec0a17-89ac-48b8-a3ce-e0007d6a0dbc_1456x1456.png&quot;}},&quot;isEditorNode&quot;:true}"></div><p>Even in the relatively exciting commercial and industrial (C&amp;I) sectors, the place where data centers show up, growth has actually slowed. Year-over-year C&amp;I demand was up 3.2% in early 2025. In the most recent data, it&#8217;s up less than 2%. That&#8217;s slower than 18 out of the last 40 years.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-4" href="#footnote-4" target="_self">4</a></p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/p/the-power-grid-crisis?utm_source=substack&utm_medium=email&utm_content=share&action=share&quot;,&quot;text&quot;:&quot;Share&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/p/the-power-grid-crisis?utm_source=substack&utm_medium=email&utm_content=share&action=share"><span>Share</span></a></p><p>If you dig into the data, and slice it up just right, you can see data center flickers. A good example is Indiana. Over the past year, power consumption grew 3.6 TWh, the fifth-largest increase of any state,<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-5" href="#footnote-5" target="_self">5</a> and I think I&#8217;ve figured out where most of it came from: Project Rainier, a data center in New Carlisle that <a href="https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster">Amazon calls</a> &#8220;one of the world&#8217;s largest AI compute clusters.&#8221;<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-6" href="#footnote-6" target="_self">6</a> That&#8217;s not nothing, but also, c&#8217;mon. Indiana&#8217;s statewide demand is up 3.5%, roughly the pace of inflation and nowhere near historic.</p><h3>Unprecedented, on repeat</h3><p>CNBC&#8217;s Brian Sullivan <a href="https://www.cnbc.com/video/2025/11/10/exelon-ceo-calvin-butler-talks-ais-power-demand-and-looming-power-shortages.html">said to Butler</a> last November, &#8220;you&#8217;ve been very, very vociferous about a coming likely shortage of power.&#8221; He has indeed. For the last two years &#8212; including a <a href="https://www.eei.org/News/news/All/eei-announces-2025-leadership-team">year as chair</a> of the Edison Electric Institute, the utility industry&#8217;s trade group &#8212;  Butler has said pretty much the same thing. Some typical lines:</p><blockquote><p>&#8220;This is probably the most growth we&#8217;ve seen in our industry since the advent of air conditioning&#8221; - <a href="https://www.axios.com/2024/08/30/exelon-energy-demand-surge">Axios</a>, 8/30/24</p></blockquote><blockquote><p>&#8220;Increased demand like we&#8217;ve never seen in the last 30 to 40 years&#8221; - <a href="https://www.cnbc.com/video/2025/11/10/exelon-ceo-calvin-butler-talks-ais-power-demand-and-looming-power-shortages.html">CNBC</a>, 11/10/25</p></blockquote><blockquote><p>&#8220;Our growth is unprecedented in the last several decades&#8221; - <a href="https://www.foxnews.com/tech/artificial-intelligence-helps-fuel-new-energy-sources">Fox News</a>, 2/2/26</p></blockquote><blockquote><p>&#8220;As demand growth accelerated&#8221; - <a href="https://www.sec.gov/Archives/edgar/data/1109357/000110935726000040/exc-20260318.htm">Letter to Our Shareholders</a>, 3/18/26 (Annual Shareholder Meeting, letter co-signed by Exelon Board Chair Paul Bowers)</p></blockquote><blockquote><p>&#8220;Increasing electricity demand, ballooning load growth&#8221; - <a href="https://east.virtualshareholdermeeting.com/vsm/web?pvskey=EXC2026">Annual Shareholder Meeting</a>, 4/28/26</p></blockquote><p>Butler&#8217;s web of storytelling sometimes borders on parody. In a recent <a href="https://www.foxnews.com/opinion/real-reason-electric-bill-soaring-summer-surprise">Fox News Op-Ed</a>, he wrote, &#8220;Electricity demand is rising fast.&#8221; To support the claim, this line links to a <a href="https://www.foxnews.com/tech/artificial-intelligence-helps-fuel-new-energy-sources">story by Bret Baier</a>. There, readers looking for evidence can find a leading utility executive describing electricity demand: &#8220;Our growth is unprecedented in the last several decades.&#8221; That executive was Exelon CEO Calvin Butler. </p><p>In fairness to Exelon&#8217;s CEO, I&#8217;ll point out two things:</p><p><strong>It&#8217;s not just Butler.</strong> Many other industry execs push the same misleading idea, constantly describing power demand as soaring.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-7" href="#footnote-7" target="_self">7</a></p><p><strong>Butler shifts, at times, between present and future tense.</strong> <a href="https://www.cnbc.com/video/2026/07/07/energy-supply-must-grow-to-meet-future-demand-says-exelon-ceo-calvin-butler.html?&amp;qsearchterm=calvin%20butler">To CNBC</a>&#8217;s Sullivan this summer, Butler referred to the need for electric supply &#8220;to fuel this future growth that we&#8217;re experiencing.&#8221; After telling the UN-week crowd that &#8220;we&#8217;re experiencing&#8221; unprecedented growth, he pivoted to Exelon&#8217;s forecast for the future.</p><p>If and when confronted with what&#8217;s on this page, I suspect Butler and Exelon may claim he was, in fact, talking about the future. For that defense to work, you have to ignore the words coming out of Butler&#8217;s mouth in the present.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-8" href="#footnote-8" target="_self">8</a></p><div class="callout-block" data-callout="true"><p>It&#8217;s worth pausing to underscore:</p><p><strong>What Butler and other utility execs are doing is f&#8217;ing ridiculous. </strong></p><p>No public company should be allowed to deceive people about its product&#8217;s sales, but electric utilities should face an especially high bar. They&#8217;ve been granted extraordinary rights &#8212; protected monopolies with virtually guaranteed profits &#8212; and, as stewards of the grid, they owe the public an honest accounting of the system they run. </p><p>Instead, by misrepresenting how much electricity is being consumed, utility executives are misleading people about their companies&#8217; financial strength &#8212; and about the state of one of our most essential public goods: the power grid. </p><p>This isn&#8217;t OK, and it needs to stop.</p></div><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/subscribe?&quot;,&quot;text&quot;:&quot;Subscribe now&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/subscribe?"><span>Subscribe now</span></a></p><h3>But, sure, let&#8217;s talk about the future</h3><p><a href="https://www.youtube.com/live/XZUU59bEoSs?t=976s">Butler put numbers on a recent forecast</a>: </p><blockquote><p>&#8220;What&#8217;s different about this wave of growth right now is the speed at which it&#8217;s happening &#8230;. We have estimated by 2030 we will add another 30 gigawatts to ComEd&#8217;s system.&#8221; </p></blockquote><p>ComEd, Exelon&#8217;s largest subsidiary, saw peak demand of 20.7 gigawatts (GW) <a href="https://www.pjm.com/-/media/DotCom/markets-ops/settlements/network-service-peak-loads-2026.pdf">in 2025</a>, so adding 30 GW more would be a 145% increase. The Chicago utility&#8217;s biggest four-year gain in electricity sales since 2000: 9%.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-9" href="#footnote-9" target="_self">9</a></p><p>Butler&#8217;s expansive view of the future &#8212; where data centers&#8217; power demand explodes &#8212; obviously has company. <a href="https://blog.samaltman.com/abundant-intelligence">Sam Altman envisions</a> a world where OpenAI runs a factory that &#8220;can produce a gigawatt of new AI infrastructure every week.&#8221; <a href="https://www.youtube.com/watch?v=tsQB0n0YV3k&amp;t=2317s">Nvidia's Jensen Huang</a> imagines AI compute drawing &#8220;likely probably 1,000 times more than we currently have.&#8221; <a href="https://rollcall.com/factbase/trump/transcript/donald-trump-press-conference-nato-summit-ankara-turkey-july-8-2026/">President Trump inhabits</a> a planet where data centers soon need &#8220;more energy than the entire country produces right now &#8230; in fact, some people say almost double.&#8221;</p><p>The last time a technological advance sent grid demand soaring, it didn&#8217;t take a wild imagination to see what was happening. </p><p>Air conditioning was a rare luxury in 1955, something you enjoyed in a movie theater or a fancy train car, but <a href="https://www2.census.gov/library/publications/1955/compendia/statab/76ed/1955-07.pdf#page=82">in almost no homes</a>. By 1975, <a href="https://www.osti.gov/servlets/purl/5339772#page=23">a majority of American households</a> had it. The power-hungry appliances fundamentally changed how and where people lived &#8212; in home after home, business after business &#8212; with electric demand tripling along the way.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-10" href="#footnote-10" target="_self">10</a> </p><p>An AI-led power boom would unfold very differently.   </p><p>Even if we assume the most bullish AI forecasts will materialize &#8212; <a href="https://www.wheresyoured.at">and we should not</a> &#8212; the added electricity would mostly show up in several hundred locations, usually far from population centers. This buildout would look nothing like the last one: most of these grid upgrades would be localized and remote. And whereas AC-era power plants and wires directly benefited tens of millions of customers, most of this wave would be built for maybe a dozen customers &#8212; a handful, really, of trillion-dollar tech companies. </p><p>It&#8217;s no surprise that Butler, Exelon, and the rest of the industry aren&#8217;t leaning into that story. &#8220;We&#8217;re building power plants and wires for data centers&#8221; sounds like a data center problem, and something data centers should pay for. But once the topic is<em> </em>the grid, writ large,<em> </em>that&#8217;s different. </p><p><em>Demand&#8217;s skyrocketing! We might not have enough supply! </em></p><p><em>Numbers are going up! Big time! </em></p><p><em>Blackouts!</em> <em>National security!</em></p><p>That water&#8217;s muddy, but it&#8217;s starting to feel like something we should all care about. And pay for.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!15Kf!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!15Kf!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png 424w, https://substackcdn.com/image/fetch/$s_!15Kf!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png 848w, https://substackcdn.com/image/fetch/$s_!15Kf!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png 1272w, https://substackcdn.com/image/fetch/$s_!15Kf!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!15Kf!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png" width="1456" height="1107" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1107,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:3297598,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/216027304?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!15Kf!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png 424w, https://substackcdn.com/image/fetch/$s_!15Kf!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png 848w, https://substackcdn.com/image/fetch/$s_!15Kf!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png 1272w, https://substackcdn.com/image/fetch/$s_!15Kf!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F7196401a-86f1-4fad-9478-a8d984135e46_2000x1520.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">See what they did there?</figcaption></figure></div><h3>A crisis with a budget</h3><p>It&#8217;ll stun you to learn: Exelon has big plans to address this crisis. </p><p>At the event where Butler said ComEd&#8217;s demand would more than double, <a href="https://www.youtube.com/live/XZUU59bEoSs?t=924s">he pointed to</a> Exelon&#8217;s plan to invest $41.7 billion of capital through 2029. Right after hitting his most-in-40-years note <a href="https://www.foxbusiness.com/video/6399164332112">during a Fox Business appearance</a>, he added, &#8220;we&#8217;re spending $10 billion in infrastructure this year to meet that demand.&#8221;</p><p>One of those infrastructure projects is in DeKalb County, Illinois, where ComEd recently won approval to build <a href="https://www.businesswire.com/news/home/20260824322298/en/Illinois-Commerce-Commission-Approves-ComEd-Transmission-Plan-for-Enhanced-Reliability-and-Resilience-in-DeKalb-County">a new high-voltage transmission line</a>. The new wire will start in the middle of a field, in a <a href="https://dekalbcountyclerkil.gov/wp-content/uploads/2023/03/cl-census.pdf">township of 901 people</a>, and run six miles to a new substation on <a href="https://www.cityofdekalb.com/DocumentCenter/View/21427/Ord-2026-029-Passed-082426-ComEd-Annex#page=5">ComEd land</a>. The property next door: <a href="https://www.cityofdekalb.com/AgendaCenter/ViewFile/Agenda/_12082025-2784#page=2">a Meta data center</a>.  </p><p>In a future piece, I&#8217;ll dive into Exelon&#8217;s plans to support that growing community.</p><p></p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/p/the-power-grid-crisis?utm_source=substack&utm_medium=email&utm_content=share&action=share&quot;,&quot;text&quot;:&quot;Share&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/p/the-power-grid-crisis?utm_source=substack&utm_medium=email&utm_content=share&action=share"><span>Share</span></a></p><div><hr></div><p><strong>On the horizon:</strong> The first of a series of deep investigations into the deals between utilities and data centers. Georgia is home to some of the country&#8217;s most ambitious data center projects, including OpenAI&#8217;s, Microsoft&#8217;s, and Google&#8217;s. <a href="https://www.georgiapower.com/">Georgia Power says</a> data centers are paying the full cost of the infrastructure to power them and that, incredibly, &#8220;they will fund a discount of ~$180 per year to the typical residential customer.&#8221;</p><p>I&#8217;ll work through the details of Georgia Power&#8217;s data center power deals, which are typical of those across the industry. By the end of the piece, three possible outcomes will become clear:</p><ol><li><p>Data center boom is real&nbsp;&#8212; and everyone&#8217;s power bills go down</p></li><li><p>Data center boom is not real &#8212; and everyone&#8217;s power bills go up</p></li><li><p>Data center boom is not real &#8212; and utilities face bankruptcy  </p></li></ol><p></p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/subscribe?&quot;,&quot;text&quot;:&quot;Subscribe now&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/subscribe?"><span>Subscribe now</span></a></p><p></p><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-1" href="#footnote-anchor-1" class="footnote-number" contenteditable="false" target="_self">1</a><div class="footnote-content"><p>Electricity sales actually <a href="https://www.eia.gov/totalenergy/data/browser/index.php?tbl=T07.06">fell 1.3% nationwide in 2023</a>. PECO supplied a link within its sponsored content, but it goes to <a href="https://www.eia.gov/todayinenergy/detail.php?id=65264">an EIA article</a> about 2024 and forecasts for 2025 and 2026.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-2" href="#footnote-anchor-2" class="footnote-number" contenteditable="false" target="_self">2</a><div class="footnote-content"><p>U.S. data from 1949 onward comes from the U.S. Energy Information Administration (EIA): most from <a href="https://www.eia.gov/totalenergy/data/monthly/">Monthly Energy Review, Table 7.6</a>, while recent year-over-year comparisons come from <a href="https://www.eia.gov/electricity/data/eia861m/">Form EIA-861M</a>. &#8220;The past year&#8221; is August 2025 through July 2026, compared to August 2024 through July 2025. Pre-1949 data: Census Bureau&#8217;s Historical Statistics of the United States (<a href="https://www2.census.gov/library/publications/1949/compendia/hist_stats_1789-1945/hist_stats_1789-1945-chG.pdf">1949 edition</a>, series G 226; <a href="https://hsus.cambridge.org/HSUSWeb/toc/treeTablePathIdDb228-233.html">Millennial Edition</a>, series Db232) and the <a href="https://www.census.gov/library/publications/1949/compendia/statab/70ed.html">1949 Statistical Abstract</a>. Leap years are adjusted to 365 days.</p><p>NOTE: if you want to browse the data yourself, <a href="https://www.eia.gov/electricity/data/browser/">EIA&#8217;s Electricity Data Browser</a> is user friendly-ish. I&#8217;ve tried to create a <a href="https://www.eia.gov/electricity/data/browser/#/topic/5?agg=0,1&amp;geo=vvvvvvvvvvvvo&amp;endsec=vg&amp;linechart=ELEC.SALES.US-ALL.M&amp;columnchart=ELEC.SALES.TX-ALL.M~ELEC.SALES.TX-RES.M~ELEC.SALES.TX-COM.M~ELEC.SALES.TX-IND.M&amp;map=ELEC.SALES.US-ALL.M&amp;freq=M&amp;start=200101&amp;end=202607&amp;ctype=linechart&amp;ltype=pin&amp;rtype=s&amp;pin=&amp;rse=0&amp;maptype=0">helpful link here</a>, but the browser can be a little squirrelly. What I suggest: find the &#8220;View a pre-generated report&#8221; box, then select &#8220;5.4 Retail sales of electricity to ultimate customers by end-use sector, by state.&#8221; </p><p>If you&#8217;re skeptical of what I&#8217;ve said here &#8212; and you&#8217;re certain data centers are changing everything, and you want to cherry-pick to find explosive demand &#8212; I&#8217;d suggest hunting in the commercial sectors, where <a href="https://omb.report/icr/202603-1905-001/doc/167366000.pdf#page=4">EIA instructs utilities</a> to report data centers (though beware it appears (or at least I suspect, strongly) that some utilities nevertheless continue to report data centers as industrial).</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-3" href="#footnote-anchor-3" class="footnote-number" contenteditable="false" target="_self">3</a><div class="footnote-content"><p>Exelon figures are for its six current utilities &#8212; ComEd, PECO, BGE, Pepco, Delmarva Power and Atlantic City Electric &#8212; in every year, including years before they joined Exelon. Data from 2018 onward: quarterly earnings releases via <a href="https://www.sec.gov/edgar/browse/?CIK=1109357&amp;owner=exclude">SEC filings</a>; 2000-2017: <a href="https://www.eia.gov/electricity/data/eia861/">Form EIA-861</a>. (Note that in 2018, the year the data sets are joined, they differ by 0.01%.) <a href="https://ecollection.ferc.gov/">FERC Form 1 filings</a> were also used to cross-check the data. Leap years adjusted to 365 days. </p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-4" href="#footnote-anchor-4" class="footnote-number" contenteditable="false" target="_self">4</a><div class="footnote-content"><p>See note 2.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-5" href="#footnote-anchor-5" class="footnote-number" contenteditable="false" target="_self">5</a><div class="footnote-content"><p>Indiana added 3,614 GWh &#8212; statewide across all utilities and sectors &#8212; Aug 2025 to Jul 2026 (vs. Aug 2024 to Jul 2025). This ranks behind Ohio (+8,366), Arizona (+5,618), Virginia (+4,979), Texas (+4,341), and well ahead of states at the other end of the spectrum, where electricity consumption shrank, such as California (-3,431), Washington (-813), Illinois (-631), and Pennsylvania (-369). For context: I&#8217;d expect an AI data center with 1 GW of IT to add roughly 7,400 GWh annually.</p><p>I&#8217;ll further examine these figures (and many others) in a piece here in several days.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-6" href="#footnote-anchor-6" class="footnote-number" contenteditable="false" target="_self">6</a><div class="footnote-content"><p>Amazon&#8217;s &#8220;Project Rainier&#8221; is a partnership with Anthropic in New Carlisle, Indiana. Using satellite imagery, <a href="https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle">Epoch AI estimates</a> the campus came online in Jun 2025 with 398 MW of IT power (about 300,000 &#8220;H100-equivalents,&#8221; Epoch&#8217;s measure of computing power, pegged to Nvidia&#8217;s H100 chip; the campus itself runs Amazon&#8217;s Trainium2 chips); ramped up to 626 MW in Dec 2025 (471k H100-equivalents); 910 MW in Mar 2026 (686k); and 1,037 MW (818k) expected in Oct 2026. Using engineering approximations (1.2 for Power Usage Effectiveness (PUE), which measures total facility load versus the IT load itself; and 70% load factor, which measures a facility&#8217;s average power use versus peak power use), I estimated likely gigawatt-hours (GWh) of electricity consumption for Project Rainier and compared them <a href="https://www.eia.gov/electricity/data/eia861m/">with meter data</a> from Indiana Michigan Power (I&amp;M), the utility that serves New Carlisle:</p><ul><li><p>569 GWh: <em>my estimate</em> for Project Rainier&#8217;s Jul 2026 power use, using Epoch&#8217;s estimated IT power (910 MW)</p></li><li><p>454 GWh: actual added Jul 2026 I&amp;M commercial sector power use (vs. Jul 2024, the last July before Rainier came online)</p></li><li><p>4,694 GWh: <em>my modeled estimate</em> for Project Rainier&#8217;s power use, Aug 2025 to Jul 2026, using Epoch&#8217;s timeline for each expansion</p></li><li><p>3,377 GWh: actual added I&amp;M commercial sector power use, Aug 2025 to Jul 2026, across all commercial customers (vs. Jun 2024 to May 2025, the 12 months before Project Rainier came online)</p></li></ul></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-7" href="#footnote-anchor-7" class="footnote-number" contenteditable="false" target="_self">7</a><div class="footnote-content"><p>Butler&#8217;s misleading claims &#8212; while especially notable, given his chairmanship of the industry&#8217;s trade group (Edison Electric Institute) from June 2025 to June 2026 &#8212; are echoed by executives across the industry. These are not slips of the tongue; they do this constantly; this footnote could be many times longer.</p><ul><li><p>AEP CEO Bill Fehrman: &#8220;a pace I have not seen in my 45-year energy career&#8221; (<a href="https://docs.aep.com/docs/newsroom/resources/earnings/2025-07/2025q2_conf_call.mp3">earnings conference call</a>, 7/30/25)</p></li><li><p>Dominion CEO Robert Blue: &#8220;We&#8217;re witnessing the fastest growth in our Virginia service territory since the days after World War II&#8221; (<a href="https://www.spglobal.com/en/research-insights/special-reports/look-forward/data-center-frontiers/interview-with-robert-m-blue">S&amp;P Global</a>, 12/2/25); &#8220;unprecedented load growth &#8230; accelerating in orders of magnitude&#8221; (<a href="https://www.fool.com/earnings/call-transcripts/2025/02/12/dominion-energy-d-q4-2024-earnings-call-transcript/">earnings conference call</a>, 2/12/25) </p></li><li><p>Duke CEO Harry Sideris: &#8220;We&#8217;ve never seen load growth like we&#8217;ve experienced the last year&#8221; (<a href="https://www.bloomberg.com/news/videos/2026-06-03/how-duke-energy-plans-to-meet-ai-demand-video">Bloomberg</a>, 6/3/26); &#8220;The growth is not theoretical. It is already showing up on our energy system&#8221; (<a href="https://www.atlanticcouncil.org/content-series/global-energy-agenda/community-trust-powers-energy-growth-in-the-united-states/">Atlantic Council</a>, 5/11/26)</p></li><li><p>Edison International (Southern California Edison parent) CEO Pedro Pizarro: &#8220;electricity demand growth unlike anything our industry has seen in decades&#8221; (<a href="https://www.linkedin.com/posts/pedro-pizarro-087a5287_there-was-a-time-when-smog-made-clear-skies-activity-7452817047287332865-XKi5/">Pizarro&#8217;s LinkedIn</a>, 4/22/26)</p></li><li><p>Edison Electric Institute (EEI - utility industry association) CEO Drew Maloney: &#8220;unprecedented growth in the energy sector&#8221; (<a href="https://www.electricperspectives.com/podcast-drew-maloney-eei/">Electric Perspectives</a>, 9/22/25)</p></li><li><p>EEI past-CEO Pat Vincent-Collawn: &#8220;Today, electricity demand is growing at its fastest pace in decades&#8221; (<a href="https://www.electricperspectives.com/pat-vincent-collawn-policy-priorities/">Electric Perspectives</a>, 2/21/25)</p></li><li><p>EEI past-CEO and former DOE Secretary Dan Brouillette: &#8220;Electricity demand is growing exponentially all throughout the country&#8221; (<a href="https://freemannews.tulane.edu/2024/10/04/former-energy-secretary-highlights-45th-tulane-business-forum">Tulane business forum</a>, 9/27/24)</p></li><li><p>Entergy CEO Drew Marsh: &#8220;The demand growth that&#8217;s taking place across the country and in Entergy&#8217;s service area is unlike anything we have seen in recent history&#8212;and, in some ways, ever&#8221; (<a href="https://www.electricperspectives.com/committed-to-resilience-a-qa-with-entergys-drew-marsh/">Electric Perspectives</a>, 5/26/25)</p></li><li><p>Georgia Power CEO Kim Greene: &#8220;an electricity demand surge unlike anything in recent memory&#8221; (<a href="https://www.ajc.com/opinion/2026/07/data-centers-raise-electric-prices-and-lower-reliability-but-not-in-georgia/">Atlanta Journal-Constitution op-ed</a>, 7/31/26)</p></li><li><p>NRECA CEO Jim Matheson: &#8220;Across the country, we know electric demand is surging &#8230; electric demand growth is the highest it has been in over two decades&#8221; (<a href="https://www.congress.gov/119/meeting/house/118171/documents/HHRG-119-IF03-Transcript-20250430.pdf#page=103">Congressional testimony</a>, 4/30/25); &#8220;demand for electricity continues to soar&#8221; (<a href="https://www.electric.coop/nrecas-matheson-nerc-winter-reliability-assessment-again-highlights-looming-reliability-challenges">NRECA press release</a>, 11/8/23)</p></li><li><p>NextEra CEO John Ketchum: &#8220;unlike anything we&#8217;ve ever seen since the end of World War II&#8221; (<a href="https://www.investor.nexteraenergy.com/~/media/Files/N/NEE-IR/reports-and-fillings/quarterly-earnings/2025/Q1%202025/Final_Q1%202025%20Script_vF.pdf">earnings conference call</a>, 4/23/25) and &#8220;unlike anything we&#8217;ve seen in generations&#8221; (<a href="https://www.investor.nexteraenergy.com/~/media/Files/N/NEE-IR/news-and-events/events-and-presentations/2026/2026-05-18%20NEED_%20Transcript.pdf">NextEra&#8211;Dominion merger conference call</a>, 5/18/26)</p></li><li><p>PG&amp;E website: &#8220;the largest era of electric demand growth in United States history&#8221; (<a href="https://www.pge.com/en/newsroom/currents/future-of-energy/revolutionizing-data-centers--the-ultimate-power-play-for-today-.html">PG&amp;E Currents</a>, 6/18/25)</p></li><li><p>Portland General&#8217;s Maria Pope: &#8220;growing at a rate we haven&#8217;t seen in decades&#8221; (EEI&#8217;s <a href="https://www.electricperspectives.com/maria-pope-portland-general-electric/">Electric Perspectives</a>, 3/17/25)</p></li><li><p>Xcel CEO Bob Frenzel: &#8220;an unprecedented surge in energy demand&#8221; (<a href="https://www.linkedin.com/posts/bob-frenzel-a0a4a6bb_ai-isnt-a-distant-concept-anymore-its-activity-7378881375925432320-QlFN/">Frenzel&#8217;s LinkedIn</a>, 9/30/25)</p></li></ul></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-8" href="#footnote-anchor-8" class="footnote-number" contenteditable="false" target="_self">8</a><div class="footnote-content"><p>It&#8217;s not as if Calvin Butler is free-styling these comments. Other Exelon executives, and the company in its general public communications, convey similar comments about current power demand. For example:</p><ul><li><p>Exelon&#8217;s EVP and Chief Legal Officer, Colette Honorable: &#8220;The load growth we face is unprecedented&#8221; and &#8220;What has dramatically changed is the demand on the electricity grid.&#8221; (<a href="https://www.exeloncorp.com/grid/what-ai-driven-data-centers-mean-for-energy-demands">Exelon - &#8216;The Grid&#8217;</a>, 9/16/25)</p></li><li><p>ComEd statement: &#8220;The Illinois 2025 Resource Adequacy Study confirms what we have been seeing at ComEd: unprecedented growth in the demand for electric power.&#8221; (<a href="https://www.cbsnews.com/chicago/news/new-report-warns-illinois-face-electricity-shortages-soaring-bills">CBS</a>, 12/17/25)</p></li><li><p>Exelon website: &#8220;Skyrocketing Demand&#8221; (<a href="https://www.exeloncorp.com/company/exelon-promise">Exelon website</a>, accessed 10/5/26)</p></li></ul></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-9" href="#footnote-anchor-9" class="footnote-number" contenteditable="false" target="_self">9</a><div class="footnote-content"><p>See note 3 regarding data sourcing. </p><p>A general comment about Butler&#8217;s forecast: there&#8217;s no chance &#8212; zero, none &#8212; that ComEd adds 30 GW, more than doubling demand, by 2030. In order for that to happen, AI product demand would need an extraordinarily bullish trajectory, probably beyond even the wildest dreams of Altman and Amodei, <em>and</em> Northern Illinois would need to become a hotbed of data center development, which would be shocking given the state&#8217;s political environment (Illinois Governor JB Pritzker <a href="https://capitolnewsillinois.com/news/gov-jb-pritzker-to-suspend-tax-breaks-for-data-centers-urging-more-discussion/">recently halted tax incentives</a> for new data centers). But even if both of those things happened, the data centers would need to be built at a physically impossible pace to meet Butler&#8217;s four-year window.</p><p>I&#8217;ve considered whether Butler misspoke about the 30 GW. Perhaps he did. But I&#8217;ve watched <a href="https://www.youtube.com/live/XZUU59bEoSs?t=959s">this section of the interview</a> at least a dozen times and his answer seems prepared. My guess: he&#8217;s referring in round numbers to every single data center in ComEd&#8217;s pipeline, and then assuming they all show up by 2030. That&#8217;s &#8230; not going to happen, and it&#8217;s at odds with how the utility describes its expectations <a href="https://icc.illinois.gov/docket/P2025-0677/documents/371565/files/651466.pdf">elsewhere</a>, but the numbers roughly match up: <a href="https://icc.illinois.gov/docket/P2025-0677/documents/377910/files/662669.pdf">in March, Illinois regulators put ComEd&#8217;s total pile of requests at 28 GW</a>.</p><p>To my fellow energy nerds: yes, my 9% figure refers to annual energy consumption (GWh) and Butler&#8217;s 30 GW forecast refers to instantaneous power. But the energy yardstick provides useful perspective and, on a relative basis, it actually understates what Butler&#8217;s (very) theoretical load would do to sales. If 30 GW of data center power showed up on ComEd&#8217;s grid, that&#8217;d cause <em>more than</em> a 145% increase in GWh, given data center load factors versus grid-wide load factors. </p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-10" href="#footnote-anchor-10" class="footnote-number" contenteditable="false" target="_self">10</a><div class="footnote-content"><p>See note 2.</p></div></div>]]></content:encoded></item><item><title><![CDATA[Meta’s Big Power Deal]]></title><description><![CDATA[Despite what Meta, the local utility, and the media say, Meta is not paying the full costs for its power plants&#8212;everyone on Louisiana&#8217;s grid is]]></description><link>https://www.isambrooks.com/p/metas-big-power-deal</link><guid isPermaLink="false">https://www.isambrooks.com/p/metas-big-power-deal</guid><dc:creator><![CDATA[SAM BROOKS]]></dc:creator><pubDate>Thu, 03 Sep 2026 20:22:52 GMT</pubDate><enclosure url="https://substack-post-media.s3.amazonaws.com/public/images/775204a5-e560-458f-a880-232fb0f47f16_1748x1748.png" length="0" type="image/jpeg"/><content:encoded><![CDATA[<p>&#8220;Meta itself is paying for the power plants.&#8221;</p><p>This was Meta AI&#8217;s response to my prompt, &#8220;Who is paying for the power plants for Meta&#8217;s Hyperion data center project?&#8221;<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-1" href="#footnote-1" target="_self">1</a> It wasn&#8217;t hallucinating. It&#8217;d spent 39 seconds reading what everyone says about this project, then repeated it. <a href="https://www.forbes.com/sites/jonmarkman/2026/03/31/meta-funds-ten-natural-gas-plants-to-power-its-largest-ai-campus/">Forbes</a>&#8217; headline: &#8220;Meta Funds Ten Natural Gas Plants To Power Its Largest AI Campus.&#8221; <a href="https://www.bloomberg.com/news/articles/2026-03-27/meta-funds-seven-entergy-gas-plants-to-power-biggest-data-center">Bloomberg</a>&#8217;s lede: &#8220;Meta is paying for the construction of &#8230; new natural gas-fired plants.&#8221; Meta&#8217;s <a href="https://www.nola.com/news/entergy-meta-louisiana-data-center-power/article_3af22cf4-171a-4e98-84c8-009d99bfa59b.html">spokesman</a>: its deal &#8220;is built to guarantee we pay those costs, not Louisianans.&#8221;</p><p>But Meta itself is not paying the power plants&#8217; full costs. Not even close.</p><p>Entergy, the Gulf South&#8217;s behemoth electric utility, is paying for the construction of these power plants. Entergy will own them. And Entergy will get paid back&#8212;and profit on them&#8212;through its customers&#8217; bills, every month, for thirty years. Meta will be one of those customers through its Hyperion campus. Like all of the utility&#8217;s customers, it will chip in to pay back Entergy for the power plants.</p><p>The utility makes all of this clear, under oath. During the <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/DocketDetails?docketId=32146">proceeding</a> that led regulators to approve the first three of <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/DocketDetails?docketId=32728">ten planned</a> power plants, <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/DocketDetails?docketId=32146">Entergy admitted</a> that Meta would cover only a &#8220;portion&#8221; of the power plants&#8217; costs. Its witnesses <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=tMpZ7woiLWg%3D">estimated</a> that, under Meta&#8217;s &#8220;Electric Service Agreement,&#8221; Meta&#8217;s payments would account for about <a href="https://lpsc.louisiana.gov/docs/transcripts/August-20-2025-BE.pdf">half</a> the cash Entergy will collect for the plants.</p><p>Total customer payments for the first three plants alone will approach $10 billion over thirty years. If Meta pays for half, Entergy Louisiana&#8217;s other 1.1 million homes and businesses are on the hook for $5 billion. Five. Billion. Dollars. All for power plants no one but Meta needed.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-2" href="#footnote-2" target="_self">2</a></p><p>And that&#8217;s the rosy picture. Meta has the unilateral right to terminate the agreement before its end date in 2041. If it does, it will pay less&#8212;perhaps far less&#8212;than half.</p><p>Imagine you and a friend are having beers at the local bar when a billionaire invites himself to join your table. He orders a bottle of champagne, because of course he does. After drinking a glass, he gets up and throws down a twenty. &#8220;That covers my portion!&#8221; he says on his way out, leaving you to pay for most of a bottle of champagne you never wanted. This is ridiculous&#8212;and it&#8217;s basically Meta&#8217;s power deal.</p><div class="subscription-widget-wrap-editor" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/subscribe?&quot;,&quot;text&quot;:&quot;Subscribe&quot;,&quot;language&quot;:&quot;en&quot;}" data-component-name="SubscribeWidgetToDOM"><div class="subscription-widget show-subscribe"><div class="preamble"><p class="cta-caption"></p></div><form class="subscription-widget-subscribe"><input type="email" class="email-input" name="email" placeholder="Type your email&#8230;" tabindex="-1"><input type="submit" class="button primary" value="Subscribe"><div class="fake-input-wrapper"><div class="fake-input"></div><div class="fake-button"></div></div></form></div></div><div><hr></div><h2>1. Entergy&#8217;s Fountain of Youth</h2><p>Nobody is happier about this deal than Entergy.</p><p>On paper, Entergy looked its age when it gathered its investors at the Four Seasons in New Orleans in June 2024. Total electricity sales at its largest subsidiary, the century-old Entergy Louisiana, had grown less than 1% annually in the previous thirty years.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-3" href="#footnote-3" target="_self">3</a> The utility&#8217;s plans were similarly sleepy: the presentation that day pegged its three-year plan for new natural-gas generation at a modest <a href="https://s201.q4cdn.com/714390239/files/doc_presentations/2024/Sep/entergy-analyst-day-2024.pdf">$235 million</a>.</p><p>But when Phillip May, Entergy Louisiana&#8217;s president, took the stage with his fellow panelist, Susan Bonnett Bourgeois, Louisiana&#8217;s economic-development secretary, they were like kids sitting on a secret they&#8217;d been told not to tell. <a href="https://stockanalysis.com/stocks/etr/transcripts/200645-analyst-day-2024/">They regaled the audience</a> with the story of May&#8217;s meeting with Governor Landry about a potential sales tax exemption. They withheld May&#8217;s <a href="https://www.nytimes.com/2026/07/27/technology/meta-data-center-louisiana.html">then-secret dinner</a> with Meta shortly before the Landry meeting, where the topic was tax breaks, but there were details about how lobbying efforts had &#8220;hijacked&#8221; an unrelated <a href="https://legiscan.com/LA/bill/HB827/2024">state bill</a> to secure those exemptions. The job description of a regulated utility usually doesn&#8217;t include lobbying for technology companies, but this stodgy old monopoly was determined to find its Corporate Botox.</p><p>Entergy celebrated its subsequent parabolic up-and-to-the-right move at this June&#8217;s investor meeting, now held at the New York Stock Exchange. Referring to Meta and Amazon, which both sent executives to join the utility on stage, <a href="https://stockanalysis.com/stocks/etr/transcripts/685619-investor-day-2026/">May said</a>, &#8220;One of the job hazards of working with folks like this is we have permanent smile on our face.&#8221; Botox will do that.</p><p>Entergy Louisiana&#8217;s three-year plan for natural-gas power plants had grown to <a href="https://s201.q4cdn.com/714390239/files/doc_presentations/2026/Jun/09/Entergy-2026-Investor-Day.pdf">$14.8 billion</a>, sixty-three times what it showed investors two years earlier. Over the past thirty years, Entergy Louisiana has spent about $10 billion on power plants. Over the next five, it plans $32 billion.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-4" href="#footnote-4" target="_self">4</a></p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!_0s9!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!_0s9!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png 424w, https://substackcdn.com/image/fetch/$s_!_0s9!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png 848w, https://substackcdn.com/image/fetch/$s_!_0s9!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png 1272w, https://substackcdn.com/image/fetch/$s_!_0s9!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!_0s9!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png" width="1456" height="889" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/b19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:889,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:351077,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/214035748?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!_0s9!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png 424w, https://substackcdn.com/image/fetch/$s_!_0s9!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png 848w, https://substackcdn.com/image/fetch/$s_!_0s9!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png 1272w, https://substackcdn.com/image/fetch/$s_!_0s9!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb19ea2e9-e4d4-4d11-be73-882e7eb80807_4200x2565.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Entergy Louisiana&#8217;s spending is up&#8212;way up&#8212;and to the right these days </figcaption></figure></div><p>Entergy will reap unprecedented profits from this spending. </p><p>That isn&#8217;t a prediction. That&#8217;s how this system was designed. A century ago, when the government was willing to make extraordinary concessions to electrify the country, the basic bargain took hold: when a utility spends money on new assets that benefit its customers, it earns a guaranteed return on that money&#8212;paid each month, for decades, from those customers&#8217; bills.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-5" href="#footnote-5" target="_self">5</a><a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-6" href="#footnote-6" target="_self">6</a></p><div><hr></div><h2>2. The &#8220;Business&#8221; Model</h2><p>The utility business model&#8212;a generous phrase, given these &#8220;businesses&#8221; have no competition and guaranteed profits&#8212;fits on a map of Richland Parish, Louisiana. Franklin Farms 1 and 2, the power plants now under construction, sit two miles up the road from Hyperion (or, in units Entergy executives would recognize, about the length of the runways at the nearby Monroe airport).</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!3ALt!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!3ALt!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png 424w, https://substackcdn.com/image/fetch/$s_!3ALt!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png 848w, https://substackcdn.com/image/fetch/$s_!3ALt!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png 1272w, https://substackcdn.com/image/fetch/$s_!3ALt!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!3ALt!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png" width="1456" height="1456" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/0081192c-ffc7-405e-be28-711713a09653_2160x2160.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1456,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:2959677,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/214035748?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!3ALt!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png 424w, https://substackcdn.com/image/fetch/$s_!3ALt!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png 848w, https://substackcdn.com/image/fetch/$s_!3ALt!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png 1272w, https://substackcdn.com/image/fetch/$s_!3ALt!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0081192c-ffc7-405e-be28-711713a09653_2160x2160.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">You can see <s>Meta&#8217;s power plants</s> the system resources from space</figcaption></figure></div><p>Everything about this says Meta. These power plants exist because Meta asked for them. They&#8217;re planted around the campus&#8217; fence line and sized to the megawatt for Meta&#8217;s planned servers. In the office of Entergy Louisiana&#8217;s Phillip May, a <a href="https://static01.nyt.com/images/2026/05/11/multimedia/00biz-meta-louisiana-03-tmfj/00biz-meta-louisiana-03-tmfj-superJumbo.jpg?auto=webp&amp;quality=90">white shovel</a> with a big Meta logo leans against the wall. These power plants are, by any normal definition, Meta&#8217;s power plants.</p><p>Entergy&#8217;s CEO, Drew Marsh, says so himself. On an investor <a href="https://www.fool.com/earnings/call-transcripts/2025/10/29/entergy-etr-q3-2025-earnings-call-transcript/">conference call last fall</a>, he was asked about &#8220;the potential for data centers to build on-site power generation themselves.&#8221; Marsh said Entergy already builds plants &#8220;very close to where the customer is located &#8230; you can see that with the Meta project.&#8221; Call them Entergy&#8217;s or call them Meta&#8217;s; it&#8217;s all the same. Marsh continued: &#8220;from a physical grid perspective &#8230; there&#8217;s a distinction without a difference.&#8221;</p><p>But from the money-flow perspective, there&#8217;s a distinct difference. And it&#8217;s a difference Entergy remembers whenever government officials are around.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-7" href="#footnote-7" target="_self">7</a></p><p>When May and Marsh smiled for the cameras at the Franklin Farms groundbreaking last December, they were surrounded by local government officials and a state regulator&#8212;but not a single Meta executive. The dignitaries held chrome shovels full of dirt; the white Meta one, apparently, didn&#8217;t make it onto Entergy&#8217;s PJ to Monroe that morning.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-8" href="#footnote-8" target="_self">8</a></p><p>In the utility&#8217;s <a href="https://www.prnewswire.com/news-releases/entergy-louisiana-breaks-ground-on-new-state-of-the-art-generation-facilities-to-power-reliability-growth-and-innovation-302629479.html">press release</a> for the event, the word &#8220;Meta&#8221; doesn&#8217;t appear until the seventh paragraph, and May&#8217;s description of the plants never mentions the company at all. The plants, he said, are &#8220;the next step in Entergy Louisiana&#8217;s long-term strategy&#8221; that will deliver &#8220;cost-effective power to our customers.&#8221; May thanked &#8220;our partners from local and state governments, the Franklin family and our communities.&#8221;</p><p>Who&#8217;s Meta? Never heard of him.</p><p>In Entergy&#8217;s <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=4y5xTw%2F15do%3D">official application</a>&#8212;which spelled out how it would fund, build, and get paid back for the power plants&#8212;the utility went out of its way to say they are not Meta&#8217;s. It asked that the assets be approved &#8220;as system resources for the benefit of all ELL customers, and not as resources constructed and designated for the benefit and use of a specific Customer.&#8221; <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=dR%2FMp4tV%2FxU%3D">The settlement</a> Entergy signed with the Louisiana Public Service Commission&#8217;s staff, Walmart, and the Sierra Club said it again.<a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-9" href="#footnote-9" target="_self">9</a></p><p>The Commission&#8217;s final order, now the law of the land, said simply (in utility-speak, &#8220;Planned Generators&#8221; are the power plants; &#8220;ELL&#8221; is Entergy Louisiana):</p><div class="captioned-image-container"><figure><div class="image-link image2" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!hMkT!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png 424w, https://substackcdn.com/image/fetch/$s_!hMkT!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png 848w, https://substackcdn.com/image/fetch/$s_!hMkT!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png 1272w, https://substackcdn.com/image/fetch/$s_!hMkT!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!hMkT!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png" width="1456" height="97" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:97,&quot;width&quot;:1456,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:93732,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/214035748?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!hMkT!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png 424w, https://substackcdn.com/image/fetch/$s_!hMkT!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png 848w, https://substackcdn.com/image/fetch/$s_!hMkT!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png 1272w, https://substackcdn.com/image/fetch/$s_!hMkT!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9a214345-aca1-4bb4-887a-95ba9d396d98_1927x128.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div></div></div></div></figure></div><div><hr></div><h2>3. &#8220;Fair Share&#8221; </h2><p>This deal has clear winners:</p><ul><li><p><strong>Meta</strong> doesn&#8217;t want to pay the full costs for these power plants if it doesn&#8217;t have to. Good news for Meta: it doesn&#8217;t have to.</p></li><li><p><strong>Entergy </strong>wins twice over, in fact:</p><ul><li><p><strong>Up and to the right:</strong> its capital spending plan, its stock, its forecasted profits&#8212;all moving in the right direction. </p></li><li><p><strong>1.1 million ways to win:</strong> Wall Street wouldn&#8217;t have <a href="https://www.google.com/finance/quote/ETR:NYSE?window=5Y">doubled</a> Entergy&#8217;s stock if this investment depended on one customer. It doesn&#8217;t. These power plants are all &#8220;system resources,&#8221; so all 1.1 million homes and businesses are on the hook to pay Entergy back. </p></li></ul></li></ul><p>If you believe Entergy, though, there&#8217;s a third winner: every Louisianan with a power bill. (Don&#8217;t believe Entergy.) </p><p>It&#8217;s as ridiculous as it sounds. Entergy&#8217;s repayment is guaranteed&#8212;that&#8217;s the whole system&#8212;so, as with everything in life, there are tradeoffs here. Every dollar Meta comes up short of &#8220;full&#8221; for its power plants is, by design, a dollar paid by everyone else.  </p><p>Still, Entergy relentlessly sells its &#8220;Fair Share Plus&#8221; <a href="https://www.entergy.com/datacenters/fairshareplus">pledge</a>. Announced in coordination with a <a href="https://www.whitehouse.gov/fact-sheets/2026/03/fact-sheet-president-donald-j-trump-advances-energy-affordability-with-the-ratepayer-protection-pledge/">White House event</a> in March and later turned into <a href="https://gov.louisiana.gov/assets/2026-Executive-Orders/JML-Executive-Order-25-058.pdf">state policy</a> by Governor Landry, the pledge says: &#8220;Data centers that move to our region must &#8230; pay their fair share for the power they use, plus create additional savings or benefits.&#8221; <a href="https://www.entergy.com/news/phillip-may-president-and-ceo-entergy-louisiana-supporting-strong-protections-for-customers-as-state-sets-clear-path-for-data-center-growth">Entergy says</a> the pledge lives in Meta&#8217;s Electric Service Agreement (ESA)&#8212;the contract that spells out what Meta pays.</p><p>But the Commission never approved the ESA. On purpose, at Entergy&#8217;s urging.</p><p><a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=nDWn%2Fjuc2%2BA%3D">The order</a> that made everything official and legal says that nothing in the certification &#8220;should be construed as approval of the ESA &#8230; or any of the terms contained therein.&#8221; The very next provision declares the plants &#8220;system resources for all ELL customers.&#8221; A few pages later, the order says its silence on the agreement &#8220;shall in no way limit or undermine&#8221; Entergy&#8217;s ability to recover its costs and profit from the power plants.</p><p>Entergy and Meta will tell you none of this matters. They&#8217;ll say the agreement and pledge have minimum bills and guarantees. Right.</p><p></p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/p/metas-big-power-deal?utm_source=substack&utm_medium=email&utm_content=share&action=share&quot;,&quot;text&quot;:&quot;Share&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/p/metas-big-power-deal?utm_source=substack&utm_medium=email&utm_content=share&action=share"><span>Share</span></a></p><p></p><div><hr></div><h2>Coming Up</h2><p>In future post(s), I&#8217;ll dive into this agreement&#8217;s minimums and guarantees, and how much Entergy will profit, and how much everyone on the grid will likely pay. The ESA itself isn&#8217;t public, and most of what the legal filings say about it is <mark data-color="#85200c" style="background-color: rgb(133, 32, 12); color: rgb(255, 255, 255);"><span data-color="#85200c" style="color: rgb(133, 32, 12);">redacted</span></mark>, but I&#8217;ve got some clues.</p><p>On this page, expect more original research and stories about the most rigged businesses in America: hiding-in-plain-sight fraud in data center power deals; mountains (some might call a bubble) of debt; engineering (financial, not physical) that turns blackouts into profits. It never ends.</p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/subscribe?&quot;,&quot;text&quot;:&quot;Subscribe now&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/subscribe?"><span>Subscribe now</span></a></p><p></p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!HFJQ!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!HFJQ!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png 424w, https://substackcdn.com/image/fetch/$s_!HFJQ!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png 848w, https://substackcdn.com/image/fetch/$s_!HFJQ!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png 1272w, https://substackcdn.com/image/fetch/$s_!HFJQ!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!HFJQ!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png" width="560" height="560" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1456,&quot;width&quot;:1456,&quot;resizeWidth&quot;:560,&quot;bytes&quot;:241071,&quot;alt&quot;:null,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:&quot;https://www.isambrooks.com/i/214035748?img=https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png&quot;,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="" srcset="https://substackcdn.com/image/fetch/$s_!HFJQ!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png 424w, https://substackcdn.com/image/fetch/$s_!HFJQ!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png 848w, https://substackcdn.com/image/fetch/$s_!HFJQ!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png 1272w, https://substackcdn.com/image/fetch/$s_!HFJQ!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F37aafe31-6693-412c-9506-fcc79c2561b8_1830x1830.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container restack-image buttonBase-GK1x3M"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button tabindex="0" type="button" class="pencraft pc-reset pencraft icon-container view-image buttonBase-GK1x3M"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Big tech&#8217;s power deals, basically</figcaption></figure></div><p></p><p></p><p><a class="footnote-anchor" data-component-name="FootnoteAnchorToDOM" id="footnote-anchor-10" href="#footnote-10" target="_self">10</a></p><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-1" href="#footnote-anchor-1" class="footnote-number" contenteditable="false" target="_self">1</a><div class="footnote-content"><p>Other AI tools responded similarly. Claude: &#8220;Meta is footing the bill for the power plants directly.&#8221; Gemini: &#8220;Meta Platforms is contractually funding the construction and power infrastructure.&#8221; (August 2026)</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-2" href="#footnote-anchor-2" class="footnote-number" contenteditable="false" target="_self">2</a><div class="footnote-content"><p>The latest estimated cost for the first three power plants: $3,999 million (Entergy's Aug. 2026 quarterly report, Docket U-37425). <span>To determine the revenue requirement, I used Entergy </span><a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=x7W0wfcIZNw%3D"><span>Louisiana's latest Test Year (2025) data</span></a><span>: 50.83% equity / 49.17% debt, 9.70% ROE, 4.22% cost of debt, 25.345% income tax, 30-year straight-line depreciation. Result: $9.3 billion, plus a $491 million turbine-service agreement&#8212;$9.8 billion before costs including O&amp;M and fuel.</span> I have excluded O&amp;M and fuel from this calculation because those costs assume the plants will be running.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-3" href="#footnote-anchor-3" class="footnote-number" contenteditable="false" target="_self">3</a><div class="footnote-content"><p><span>U.S. Energy Information Administration, Form EIA-861, Annual Electric Power Industry Report, "Sales to Ultimate Customers.&#8221; Prior to 2015, I added the Louisiana sales of Entergy Gulf States Louisiana, the sister utility that merged into Entergy Louisiana in 2015.</span></p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-4" href="#footnote-anchor-4" class="footnote-number" contenteditable="false" target="_self">4</a><div class="footnote-content"><p>It&#8217;s as if Entergy has adopted the planning habits of its new friends in big tech. In February 2025, the firm&#8217;s <a href="https://s201.q4cdn.com/714390239/files/doc_financials/2024/q4/4Q24-Webcast.pdf">quarterly update</a> showed a $2.3 billion plan for new natural-gas power plants for 2026-2027. In June 2026, Entergy <a href="https://s201.q4cdn.com/714390239/files/doc_presentations/2026/Jun/09/Entergy-2026-Investor-Day.pdf">told Wall Street</a> it expected to spend $9.4 billion during that same two-year period. Sixteen months; quadrupled spending. This kind of rapid change is not normal in this industry&#8212;with its government regulation and oversight&#8212;because plans are supposed to pass through, you know, regulation and oversight.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-5" href="#footnote-anchor-5" class="footnote-number" contenteditable="false" target="_self">5</a><div class="footnote-content"><p>Entergy expects to make so much money that it seems almost embarrassed to say how much. </p><p>&#8220;Greater than 8%&#8221; reads the title of slide seven in its <a href="https://s201.q4cdn.com/714390239/files/doc_financials/2026/q2/2Q26-Presentation.pdf">July 29, 2026 update to Wall Street</a>. The slide then details Entergy&#8217;s forecasted earnings for each of the next five years, from $3.91 a share last year to $7.20 in 2030. <sup>(7.20 &#247; 3.91)^(1/5) &#8211; 1 = 12.99%</sup> In other words, Entergy actually expects annual growth of 12.99%&#8212;a whole lot greater than 8%. </p><p>On Wall Street, 499 basis points is <em>a lot</em> when it comes to earnings growth and not something a company would ever leave to careless editing. Haters might suggest that Entergy, wary of data center backlash, did not want to show the public how much money it&#8217;s making from data centers. (I would say that, too.) </p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-6" href="#footnote-anchor-6" class="footnote-number" contenteditable="false" target="_self">6</a><div class="footnote-content"><p>In the first several decades of the twentieth century, a <a href="https://tile.loc.gov/storage-services/service/ll/usrep/usrep262/usrep262679/usrep262679.pdf">compact</a> took hold (and was subsequently <a href="https://tile.loc.gov/storage-services/service/ll/usrep/usrep320/usrep320591/usrep320591.pdf">affirmed</a> by the Supreme Court). In exchange for &#8220;regulation,&#8221; the government&#8212;which wanted to electrify the country as fast as possible&#8212;assured utilities that any prudent investment would be repaid, plus a &#8220;reasonable&#8221; return for their lenders and investors. I assure you, dear reader, that I will write no more than 50,000 words in future articles that describe and criticize this antiquated arrangement.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-7" href="#footnote-anchor-7" class="footnote-number" contenteditable="false" target="_self">7</a><div class="footnote-content"><p>In legal documents, Entergy acknowledges the money-flow perspective. Next to Franklin Farms, several substations are being built to link the power plants with the Hyperion building. <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=nDWn%2Fjuc2%2BA%3D">These substations are being funded directly by Meta</a>: the technology firm is putting up the cash to pay for these assets, no 30-year payback-to-the-utility involved. In its <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=4y5xTw%2F15do%3D">formal application</a>, the same one in which the power plants are called &#8220;system resources,&#8221; Entergy calls these &#8220;Customer-Paid Substations.&#8221;</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-8" href="#footnote-anchor-8" class="footnote-number" contenteditable="false" target="_self">8</a><div class="footnote-content"><p>Entergy&#8217;s leased Bombardier jets have made at least sixteen trips to the Monroe airport since January 1, 2024, including a flight in from New Orleans on the morning of the Franklin Farms groundbreaking (December 1, 2025).</p><p>I went on a week-long PJ kick&#8212;researching, not flying; I wish&#8212;for my book. I have so much in my notes about the utility industry&#8217;s use of private jets that I could probably write a whole other book on the topic. My research about Entergy&#8217;s fleet includes transponder data, job postings for pilots, radio registrations, and more. I don&#8217;t plan to release any of that here, even in the footnotes, because I&#8217;m aware that publicly available aircraft information has been used to threaten the safety of the people it&#8217;s released about. I&#8217;ll probably surface other items from time to time: the run to Las Vegas for the Super Bowl is probably too good to leave out; and don&#8217;t worry Duke Energy, looking at you too! But I&#8217;ll be careful about sourcing. If journalists or anyone else wants to check my work: contact me.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-9" href="#footnote-anchor-9" class="footnote-number" contenteditable="false" target="_self">9</a><div class="footnote-content"><p>On July 3, 2025, the Sierra Club <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=K2zJOC518lE%3D">filed a brief</a> with the Louisiana Public Service Commission that began &#8220;The Commission should reject the Application of Entergy Louisiana &#8230; to build over 2 GW of generation &#8230; to serve a large data center customer (&#8217;Meta&#8217;),&#8221; and called the proposal &#8220;not in the public interest.&#8221; It asked the Commission, specifically, to &#8220;reject the Company&#8217;s request to include and treat the proposed CCCTs as system resources for the benefit of all ELL customers.&#8221;</p><p>On July 11, the Sierra Club signed <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=dR%2FMp4tV%2FxU%3D">a settlement</a> with Entergy, the Commission&#8217;s staff, and Walmart that says &#8220;The Planned Generators are to be treated as system resources for all [Entergy Louisiana] customers.&#8221;</p><p><a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=4y5xTw%2F15do%3D">Entergy had already proposed a new 1,500 MW subscription-based solar program in December 2024</a>. The final <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=dR%2FMp4tV%2FxU%3D">settlement</a> paperwork does include language that Entergy would make &#8220;commercially reasonable best efforts&#8221; to file for 500 MW within six months, but this does not line up with their <a href="https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=K2zJOC518lE%3D">pre-hearing demands</a>. I do not know what other concessions may or may not have been made. What I do know: eight days after saying the opposite, the Sierra Club was fine with everyone on Entergy Louisiana&#8217;s grid paying for Meta&#8217;s gas-fired power plants. Cool, cool.</p></div></div><div class="footnote" data-component-name="FootnoteToDOM"><a id="footnote-10" href="#footnote-anchor-10" class="footnote-number" contenteditable="false" target="_self">10</a><div class="footnote-content"><p>Going HAM in the footnotes.</p></div></div>]]></content:encoded></item><item><title><![CDATA[September 3]]></title><description><![CDATA[That&#8217;s when I'll start exposing electric utilities &#8212; the most rigged businesses in America &#8212; and the AI power boom: who&#8217;s profiting, and who&#8217;s paying.]]></description><link>https://www.isambrooks.com/p/im-calling-bullshit</link><guid isPermaLink="false">https://www.isambrooks.com/p/im-calling-bullshit</guid><dc:creator><![CDATA[SAM BROOKS]]></dc:creator><pubDate>Mon, 24 Aug 2026 22:44:05 GMT</pubDate><enclosure url="https://substackcdn.com/image/fetch/$s_!UmM3!,w_256,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fb0a7c38e-eab5-4fab-a385-071bb299682a_1280x1280.png" length="0" type="image/jpeg"/><content:encoded><![CDATA[<p>First up, on September 3, a series taking apart AI power deals. It opens in Louisiana, with Meta and Entergy, with the line the media regurgitates constantly: data centers are paying in full for their power. They&#8217;re not, and I&#8217;m calling bullshit.</p><p>Subscribe and I&#8217;ll send it to you.</p><p></p><p class="button-wrapper" data-attrs="{&quot;url&quot;:&quot;https://www.isambrooks.com/subscribe?&quot;,&quot;text&quot;:&quot;Subscribe now&quot;,&quot;action&quot;:null,&quot;class&quot;:null}" data-component-name="ButtonCreateButton"><a class="button primary" href="https://www.isambrooks.com/subscribe?"><span>Subscribe now</span></a></p><p></p>]]></content:encoded></item></channel></rss>