Many data centers — AI’s factories — are plugged in, but utilized at surprisingly low levels. For hundreds of billions of dollars, you’d think they’d use them.
Half-used halls next to multi-year waitlists is the utilization–power mismatch in one picture. Live DCPI (Data Center Power Index) still splits where new load can land: Midland–Odessa is 80.6 BUILD, Dallas 42 CAUTION, and Ashburn 20 AVOID (DC Hub (dchub.cloud), as of 2026-11-06). Spare rack hours do not rewrite a constrained interconnection outlook in the tight metros.
Datacenters are much like power grids: even with every server switched on, they cannot run at full capacity around the clock. Demand peaks in the morning and falls to its lowest level overnight, with average utilization typically around 50%.
Most contracts, however, are structured on a “take-or-pay” basis, meaning AI labs pay a fixed monthly fee regardless of actual utilization.
That said, I’m sure some datacenters also have tons of chips collecting dust.
Thanks for the note! I def hope utilities start paying attention to the actual utilization of data centers, bc many have been planning on darn-near full utilization. RE the data center-utility contracts, I certainly have a different perspective: I think they're stunningly weak in terms of *actual* guaranteed money from the AI labs. If they bail — if in fact data centers are collecting dust and don't need power — they can terminate with little money paid (relative to the costs of the plants/wires built for them). Anyway, I'll be publishing tons more on that soon, incl piece next wk on Georgia Power's deals.
Why would they deceive us? they CAN run at capacity. Can? can.
Half-used halls next to multi-year waitlists is the utilization–power mismatch in one picture. Live DCPI (Data Center Power Index) still splits where new load can land: Midland–Odessa is 80.6 BUILD, Dallas 42 CAUTION, and Ashburn 20 AVOID (DC Hub (dchub.cloud), as of 2026-11-06). Spare rack hours do not rewrite a constrained interconnection outlook in the tight metros.
Thanks Sam for the detailed report.
Datacenters are much like power grids: even with every server switched on, they cannot run at full capacity around the clock. Demand peaks in the morning and falls to its lowest level overnight, with average utilization typically around 50%.
Most contracts, however, are structured on a “take-or-pay” basis, meaning AI labs pay a fixed monthly fee regardless of actual utilization.
That said, I’m sure some datacenters also have tons of chips collecting dust.
Thanks for the note! I def hope utilities start paying attention to the actual utilization of data centers, bc many have been planning on darn-near full utilization. RE the data center-utility contracts, I certainly have a different perspective: I think they're stunningly weak in terms of *actual* guaranteed money from the AI labs. If they bail — if in fact data centers are collecting dust and don't need power — they can terminate with little money paid (relative to the costs of the plants/wires built for them). Anyway, I'll be publishing tons more on that soon, incl piece next wk on Georgia Power's deals.
So clear. Passionate. Beautifully written. Great analogies making a complicated subject understandable. Love, Mom